1 |
54-17-23-24 |
Installation of Solar Street Light front side of Ujil Sansad, Betahar, Kesobpur, Khantapara and Makail GP-Karanji in P.S. Kushmandi-70386665 |
|
Nihar Ghosh |
09/01/2024 |
₹460,420.00 |
04/03/2024 |
335/ZP |
Not started |
60
|
15th FC UN TIED(2nd ) (2023-24) |
|
2 |
54-16-23-24 |
Installation of Solar Street Light front side of Barampur IDgha math and road side GP-Hazatpur in P.S. Tapan-70890385 |
|
Nihar Ghosh |
09/01/2024 |
₹736,671.00 |
04/03/2024 |
334/ZP |
Not started |
60
|
15th FC UN TIED(2nd ) (2023-24) |
|
3 |
54-15-23-24 |
Installation of Mini Mast with LED Solar Street Light at Gupinathpur GP-Ajmatpur in P.S. Tapan-70385254 |
|
Nihar Ghosh |
09/01/2024 |
₹434,984.00 |
04/03/2024 |
333/ZP |
Not started |
60
|
15th FC UN TIED(2nd ) (2023-24) |
|
4 |
54-14-23-24 |
Installation of Mini Mast with LED Solar Street Light at Panchagram Bazar, GP_ Udau in P.S. Gangarampur-68376462 |
|
Nihar Ghosh |
09/01/2024 |
₹434,984.00 |
04/03/2024 |
332/ZP |
Not started |
60
|
15th FC UN TIED(2nd ) (2023-24) |
|
5 |
54-13-23-24 |
Installation of Mini Mast with LED Solar Street Light at Nehamba Bazar, GP- Ashokgram in P.S - Gangarampur-68376272 |
|
Nihar Ghosh |
09/01/2024 |
₹434,984.00 |
04/03/2024 |
331/ZP |
Not started |
60
|
15th FC UN TIED(2nd ) (2023-24) |
|
6 |
54-12-23-24 |
Installation of Mini Mast with LED Solar Street Light at Sarada Shisu Mandir beside Thangapara High School, GP-Belbari-II in P.S. Gangarampur.- 68374999 |
|
Nihar Ghosh |
09/01/2024 |
₹434,984.00 |
04/03/2024 |
330/ZP |
Not started |
60
|
15th FC UN TIED(2nd ) (2023-24) |
|
7 |
54-11-23-24 |
Installation of Solar Powered infront of Daulatpur FP School GP-Ganguria under Bnabshihari PS-69615067 |
|
Nihar Ghosh |
09/01/2024 |
₹543,198.00 |
04/03/2024 |
329/ZP |
Not started |
60
|
15th FC TIED(1st) (2023-24) |
|
8 |
54-10-23-24 |
Installation of Solar Powered water ATM in front of Nichinta Madressa mat at Nichinta under Harsura GP in P.S. Tapan-69619006 |
|
Kalyan Bose |
09/01/2024 |
₹529,769.00 |
04/03/2024 |
328/ZP |
Not started |
60
|
15th FC TIED(1st) (2023-24) |
|
9 |
54-09-23-24 |
Construction of Covered Drain from Deor High School to North Side culvert with soak pit under Deor GP in P.S. Kumarganj-70795931 |
|
Somnath Kuiry |
09/01/2024 |
₹971,153.00 |
04/03/2024 |
327/ZP |
Not started |
60
|
15th FC TIED(1st) (2023-24) |
|
10 |
54-07-23-24 |
Supply of safe drinking water providing Water ATM at front side of Pirmajar, GP-Mahabri under banshihari PS.-52228722 |
|
Suhita Paul |
09/01/2024 |
₹543,198.00 |
04/03/2024 |
326/ZP |
Not started |
60
|
15th FC TIED (2022-2324) |
|
11 |
54-06-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Sahidul Miah in GP-Rampara Chenchra, P.S. Tapan-71012900 |
|
Nihar Ghosh |
09/01/2024 |
₹871,692.00 |
04/03/2024 |
325/ZP |
Not started |
60
|
15th FC TIED(1st) (2023-24) |
|
12 |
54-05-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Bimal Das in GP-Damdama in P.S. Gangarampur-71008222 |
|
Nihar Ghosh |
09/01/2024 |
₹871,692.00 |
04/03/2024 |
324/ZP |
Not started |
60
|
15th FC TIED(1st) (2023-24) |
|
13 |
54-04-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Paimuddin Miah in GP-Damdama in P.S. Gangarampur-71009130 |
|
Nihar Ghosh |
09/01/2024 |
₹871,692.00 |
04/03/2024 |
323/ZP |
Not started |
60
|
15th FC TIED(1st) (2023-24) |
|
14 |
53-1-23-24 |
Design, manufacturing, supply, delivery & commissioning of 4-wheeled Trailer Mounted 3000 Ltr. Cesspool Emptier or Sewer Suction Machine (Detail Specification in Annexure-I) |
|
Kalyan Bose |
01/12/2023 |
₹942,000.00 |
27/02/2024 |
285/ZP |
Not started |
15
|
15th FC TIED (20-21) |
|
15 |
52-06-23-24 |
Construction of BT Road from Muripukur(PMGY) to House of Makbul Tappo via House of Suka Master vill of Bandighi under Harsura GP in P.S. Tapan. L- 0.89 KM |
|
Kalyan Bose |
28/11/2023 |
₹2,733,311.00 |
20/02/2024 |
253/ZP |
Not started |
90
|
RASTASHREE - II |
|
16 |
52-02-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Susanta Saha, Maligaon GP under Kushmandi Block-66445424 |
|
Nihar Ghosh |
28/11/2023 |
₹770,406.00 |
20/02/2024 |
252/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
17 |
52-02-23-24 |
Repairing and Maintenance of BT road from Karai Chanchera High School more(Murshidabad road) to Tapan new Integrated School in P.S. Tapan |
|
Kalyan Bose |
28/11/2023 |
₹1,485,294.00 |
20/02/2024 |
439/ZP |
Not started |
90
|
Repair & Maintenance of rural road |
|
18 |
52-01-23-24 |
Repairing and Maintenance of Bridge wing Wall and adjacent of road of Disnagar Khari Bridge, GP-Bhour in P.S. Kumarganj |
|
Somnath Kuiry |
28/11/2023 |
₹1,019,751.00 |
20/02/2024 |
251/ZP |
Not started |
90
|
Repair & Maintenance of rural road |
|
19 |
51-14-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Goutam Roy in GP-Belbari-I in P.S. Gangarampur-71005839 |
|
Nihar Ghosh |
28/11/2023 |
₹871,692.00 |
20/02/2024 |
250/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
20 |
51-13-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Dipankar Roy in GP-Nandanpur in P.S. Gangarampur-71006582 |
|
Nihar Ghosh |
28/11/2023 |
₹871,692.00 |
20/02/2024 |
249/ZP |
Not started |
|
15th FC TIED (2023-24) |
|
21 |
51-07-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Minal Kanti Sarkar in GP-Bhour, P.S. Kumarganj-71017880 |
|
Nihar Ghosh |
28/11/2023 |
₹0.00 |
20/02/2024 |
248/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
22 |
51-06-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Majidur Rahaman Mondal in GP-Bhour, P.S. Kumarganj-71017170 |
|
Nihar Ghosh |
28/11/2023 |
₹781,421.00 |
20/02/2024 |
247/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
23 |
51-05-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Majidur Rahaman Mondal in GP-Bhour, P.S. Kumarganj-71017170 |
|
Nihar Ghosh |
28/11/2023 |
₹781,421.00 |
20/02/2024 |
247/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
24 |
51-04-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Ratan Hazra S/o Bital Hazra in GP-Ramchandrapur, P.S. Tapan-71013608 |
|
Nihar Ghosh |
01/01/1970 |
₹871,692.00 |
20/02/2024 |
245/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
25 |
51-03-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Joysna Sarkar in GP-Bolla, P.S. Balurghat-71021659 |
|
Nihar Ghosh |
28/11/2023 |
₹735,328.00 |
01/01/1970 |
244/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
26 |
51-02-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Bishwajit Ghosh in GP-Boaldar P.S. Balurghat-71002554 |
|
Nihar Ghosh |
28/11/2023 |
₹735,328.00 |
20/02/2023 |
243/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
27 |
51-01-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Monoj Kr. Nath in GP-Bolla, P.S. Balurghat-71022357 |
|
Nihar Ghosh |
28/11/2023 |
₹735,328.00 |
20/02/2024 |
242/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
28 |
50-06-23-24 |
Construction of CC Road From Manikore Borodangi Road towards Sukumar Sarkar House in P.S. Kushmandi. |
|
Suhita Paul |
10/11/2023 |
₹2,179,217.00 |
20/02/2024 |
241/ZP |
Not started |
180
|
Repair & Maintenance 2023 |
|
29 |
50-05-23-24 |
Blacktop road from Kandarpur to Pajidar Rahaman’s House under Ganguria GP in P.S. Banshihari. |
|
Suhita Paul |
10/11/2023 |
₹3,882,653.00 |
20/02/2024 |
240/ZP |
Not started |
180
|
Repair & Maintenance 2023 |
|
30 |
50-04-23-24 |
Blacktop road from Dakshin Bahadurpur MR Dealer Shop towards Maheshpur via Mijan’s house in P.S. harirampur. |
|
Kalyan Bose |
10/11/2023 |
₹5,826,923.00 |
20/02/2024 |
239/ZP |
Not started |
180
|
Repair & Maintenance 2023 |
|
31 |
50-03-23-24 |
Construction of CC Road From Pacca Road near Anisur master’s House to Uttar Kuraha(Buradanga village) under Bhour GP in P.S. Kumarganj. |
|
Somnath Kuiry |
10/11/2023 |
₹3,884,615.00 |
20/02/2024 |
238/ZP |
Not started |
180
|
Repair & Maintenance 2023 |
|
32 |
50-01-23-24 |
Construction of CC Road from Fopra Bridge to Farashpur Village in P.S. Kushmandi. |
|
Suhita Paul |
10/11/2023 |
₹6,010,401.00 |
20/02/2023 |
237/ZP |
Not started |
180
|
Repair & Maintenance 2023 |
|
33 |
48-11-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Mokimuddin Sarkar in GP-Udaypur in P.S. Kushmandi-71005135 |
|
Nihar Ghosh |
17/10/2023 |
₹781,421.00 |
31/01/2024 |
140/ZP |
Not started |
60
|
15th FC TIED (2023-24 |
|
34 |
48-10-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Tapan Kr. Roy in GP-Kushmandi in P.S. Kushmandi-71022985 |
|
Suhita Paul |
17/10/2023 |
₹781,421.00 |
31/01/2024 |
125/ZP |
Not started |
60
|
Installation of Solar Powered LDTW for Irrigation at the Land of Tapan Kr. Roy in GP-Kushmandi in P.S. Kushmandi-71022985 |
|
35 |
48-09-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Rakib Sarkar in GP-Uday in P.S. Gangarampur-70997396 |
|
Nihar Ghosh |
17/10/2023 |
₹871,692.00 |
31/01/2024 |
123/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
36 |
48-08-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Obaidul Mondal in GP-Chaloon in P.S. Gangarampur-71001189 |
|
Nihar Ghosh |
17/10/2023 |
₹871,692.00 |
31/01/2024 |
127/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
37 |
48-03-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Rokeya Bibi in GP-Uday in P.S. Gangarampur-71015051 |
|
Nihar Ghosh |
17/10/2023 |
₹871,692.00 |
31/01/2024 |
126/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
38 |
48-02-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Latifar Rahaman in GP-Damdama in P.S. Gangarampur-71037076 |
|
Nihar Ghosh |
17/10/2023 |
₹871,692.00 |
31/01/2024 |
124/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
39 |
48-01-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Shibu Kujur in GP-Gangarampur in P.S. Ganagarampur-70988453 |
|
Nihar Ghosh |
17/10/2023 |
₹871,692.00 |
31/01/2024 |
122/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
40 |
47-15-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Biswajit Das in GP-Batun, P.S. Kumarganj-71020957 |
|
Nihar Ghosh |
16/10/2023 |
₹781,421.00 |
31/01/2024 |
121/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
41 |
47-08-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Soleman Mondal in GP-Hazratpur, P.S. Tapan-71015751 |
|
Nihar Ghosh |
16/10/2023 |
₹871,692.00 |
31/01/2024 |
120/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
42 |
47-05-23-24 |
Installation of Solar Powered LDTW for Irrigation at the Land of Mijanur Sarkar in GP-Chandipur, P.S. Tapan-71007396 |
|
Nihar Ghosh |
16/10/2023 |
₹871,692.00 |
31/01/2024 |
119/ZP |
Not started |
60
|
15th FC TIED (2023-24) |
|
43 |
45-09-23-24 |
Drinking Water facility infront side of Daulatpur Bajar by sinking and installation 150mmx 80mm tubewell(solar operated) in P.S. Banshihari-47388317 |
|
Suhita Paul |
16/10/2023 |
₹970,160.00 |
31/01/2024 |
117/ZP |
Not started |
90
|
15th FC TIED (2021-22) |
|
44 |
45-07-23-24 |
Installation of Solar Street Light at Jamlabad front side of Mijanur Sarkar House in P.S.Tapan-69385759 |
|
Nihar Ghosh |
16/10/2023 |
₹736,671.00 |
31/01/2024 |
116/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
45 |
45-06-23-24 |
Installation of Solar Powered water ATM in front of Prativa Roy House in P.S. Gangarampur-69616215 |
|
PABAN BASAK |
16/10/2023 |
₹534,194.00 |
31/01/2024 |
115/ZP |
Not started |
60
|
15th FC TIED (23-24) (1st Phase) |
|
46 |
45-05-23-24 |
Installation of Solar Powered water ATM in front of Gangarampur Kishok Mandi in P.S. Gangarampur-69620583 |
|
PABAN BASAK |
16/10/2023 |
₹534,194.00 |
31/01/2024 |
114/ZP |
Not started |
60
|
15th FC TIED (23-24) (1st Phase) |
|
47 |
45-04-23-24 |
Construction of Cover drain from Bimal Shyanal House to kalimandir with soak pit in P.S. Gangarampur-68422689 |
|
PABAN BASAK |
16/10/2023 |
₹582,538.00 |
31/01/2024 |
113/ZP |
Not started |
60
|
15th FC TIED (23-24) (1st Phase) |
|
48 |
45-03-23-24 |
Constuction of CC Road From Krishnapur Bus Stand to Matiur Rahaman House in P.S. Kumarganj-68310212 |
|
Somnath Kuiry |
16/10/2023 |
₹971,154.00 |
31/01/2023 |
139/ZP |
Not started |
60
|
|
|
49 |
45-02-23-24 |
Construction of CC Road from Satipukur Pakka Rasta to Mijanur House via Jallai F.P School in P.S. Kumarganj-68370615 |
|
Somnath Kuiry |
16/10/2023 |
₹646,671.00 |
31/01/2024 |
138/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
50 |
45-01-23-24 |
Construction of CC Road from Jigakuri uttar paca CC Road to Anukul Mondal house in P.S. Kumarganj-70393309 |
|
Somnath Kuiry |
16/10/2023 |
₹582,692.00 |
31/01/2024 |
112/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
51 |
44-13-23-24 |
Repairing of Metal Road from Umanandapur SSK towards end point of Concrete Road of Paboil in P.S. Tapan. |
|
Kalyan Bose |
16/10/2023 |
₹2,970,588.00 |
25/01/2024 |
92/ZP |
Not started |
90
|
Repair & Maintenance of rural road |
|
52 |
44-10-23-24 |
Construction of covered drain from Polash Das Shop to Hospital under Nazirpur GP in P.S. Balurghat-58366041 |
|
SMRITI CHANDRA KARMAKAR |
16/10/2023 |
₹1,188,234.00 |
31/01/2024 |
137/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
53 |
44-07-23-24 |
Construction of CC Road from Disnagar Pakka Road to Bimal Sarkar House via Disnagar at Disnagar under Bhour GP in P.S. Kumarganj.-68370758 |
|
Somnath Kuiry |
16/10/2324 |
₹1,030,570.00 |
31/01/2024 |
136/ZP |
Not started |
90
|
15th FC UN-TIED (23-24) (1st Phase) |
|
54 |
44-05-23-24 |
Repair and maintenance of Bituminus Road from Pucca Road at Noksha to Chaksham village via Chakram FP School under Bhatpara GP in P.S. Balurghat |
|
SMRITI CHANDRA KARMAKAR |
29/10/2023 |
₹4,855,769.00 |
31/07/2024 |
753/ZP |
Not started |
120
|
MPLAD |
|
55 |
44-02-23-24 |
Repair maintenance of cc road from Mahindar Jame Masjid to the house of Masud Rahaman via Primary School under Ramchandrapur GP in PS – Tapan |
|
Kalyan Bose |
16/10/2023 |
₹1,272,595.00 |
25/01/2024 |
91/ZP |
Not started |
90
|
Repair & Maintenance of rural road |
|
56 |
43-06-23-24 |
Construction of Community Toilet in front of Jamia Darus Salam School in P.S. Harirampur-69390662 |
|
Kalyan Bose |
03/10/2023 |
₹968,691.00 |
25/01/2024 |
90/ZP |
Not started |
90
|
15th FC TIED (23-24) (1st Phase) |
|
57 |
43-04-23-24 |
Construction of CC Road from Sahabuddin Mondal House to Sunil Kachuya House(Hapur Pukur) at Mahanaj under Harsura GP in P.S. Tapan-76054851 |
|
Kalyan Bose |
03/10/2023 |
₹922,595.00 |
25/01/2024 |
89/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
58 |
42-11-23-24 |
Installation of Mini Mast with LED Solar Street light at Balihara Shisu Shikha Kendra in P.S. Gangarampur-70388877 |
|
Nihar Ghosh |
29/09/2023 |
₹434,984.00 |
25/01/2024 |
88/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
59 |
42-10-23-24 |
Installation of Solar Stree light front side of Bolla ED GHA Mat to Bikuch village in P.s. Balurghat-70382657 |
|
Nihar Ghosh |
29/09/2023 |
₹782,713.00 |
25/01/2024 |
87/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
60 |
42-09-23-24 |
Installation of Solar Street light front side of Mallik pur Primary Health Centre to east Masjit. In P.S. Balurghat-70380030 |
|
Nihar Ghosh |
29/09/2023 |
₹552,504.00 |
25/01/2024 |
86/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
61 |
42-08-23-24 |
Installation of Solar Stree light front side of Gotahar and Boykuntapur Area in P.S. Gangarampur-70378162 |
|
Nihar Ghosh |
29/09/2023 |
₹552,504.00 |
25/01/2024 |
85/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase |
|
62 |
42-07-23-24 |
Installation of Mini Mast with LED Solar Street light near Chak Baliram Jr. High School in P.S. Tapan-68390102 |
|
Nihar Ghosh |
29/09/2023 |
₹434,984.00 |
25/01/2024 |
84/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
63 |
42-06-23-24 |
Installation of Solar street light at front side of Kadamtali more -3pc vill- Patiram , in front of Chabi sutradhar, Bipul Sarkar, Raghunathpur., Mantu Mahanta pravash Sarkar, Srimanta Sarkar Malancha Sansad and Mukul Das house , Mahinagar Sansad(10 nos @50K) in P.S. Balurghat-69387975 |
|
Nihar Ghosh |
29/09/2023 |
₹460,420.00 |
25/01/2024 |
83/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
64 |
42-04-23-24 |
Installation of Mini Mast with LED Solar Street Light at Shibmandir More in P.S. Gangarampur-68388073 |
|
Nihar Ghosh |
29/09/2023 |
₹434,984.00 |
25/01/2024 |
82/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
65 |
42-03-23-24 |
Installation of Solar Street Light front side of Debipur Sherpur, Velakuri, Mahipal, Angaribon, Purbo Basail, Sutaharpara 14 nos@ 50 K-68386885 |
|
Nihar Ghosh |
29/09/2023 |
₹690,629.00 |
25/01/2024 |
81/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
66 |
42-02-23-24 |
Installation of Solar Street Light front side of Gomsed Rahaman House and other road side 10 nos(50K) in P.S. Kushmandi-68435027 |
|
Nihar Ghosh |
29/09/2023 |
₹460,420.00 |
25/01/2024 |
80/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
67 |
42-01-23-24 |
Installation of Mini Mast with LED Solar Street Light at Manail Bazar in P.S. Tapan-68376681 |
|
Nihar Ghosh |
29/09/2024 |
₹434,984.00 |
25/01/2024 |
79/ZP |
Not started |
60
|
15th FC UN-TIED (23-24) (1st Phase) |
|
68 |
41-06-23-24 |
Construction for ground floor and 1st floor (only structural part) of Maitre Chakra Club in P.S. Balurghat |
|
SMRITI CHANDRA KARMAKAR |
25/01/2024 |
₹994,040.00 |
25/01/2024 |
78/ZP |
Not started |
180
|
MPLAD |
|
69 |
41-05-23-24 |
Supplying & Fitting of approved make Gym equipment’s at Gangarampur Chittaranjan Sporting & Cultural Club in P.S. Gangarampur. |
|
Kalyan Bose |
01/01/1970 |
₹289,998.00 |
29/07/2024 |
871/ZP |
Not started |
30
|
MPLAD |
|
70 |
41-03-23-24 |
Construction of Public Health unit (BPHU) under XV-FC HG during the year 2023-24(Internal Electrification work) at Hili RH in Hili PS |
|
Nihar Ghosh |
20/09/2023 |
₹697,566.00 |
25/01/2024 |
76/ZP |
Not started |
90
|
15th FC Health Grant(23-24) |
|
71 |
41-03-23-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Rejaul Sarkar and Fayejuddin Sarkar at Mollickpur Mouza, Bolla GP under Balurghat Block-66436085 |
|
Nihar Ghosh |
20/09/2023 |
₹770,406.00 |
25/01/2024 |
77/ZP |
Not started |
60
|
15th FC Health Grant(23-24) |
|
72 |
41-01-23-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Biman Toppo at Mallikpur mouza,Autina G.P. under Tapan Block-66436754 |
|
Nihar Ghosh |
20/09/2023 |
₹770,406.00 |
25/01/2024 |
75/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
73 |
39-04-23-24 |
Supply and Installation of LED Street Light at DDZP Office Campus-76056211. |
|
Nihar Ghosh |
24/08/2023 |
₹582,613.00 |
04/10/2023 |
1474/ZP |
Not started |
45
|
15th FC Un-TIED( Supplementary 22-23) |
|
74 |
39-3-23-24 |
Fencing work at Club Filed of Srijani Sangha and Library in P.S. Balurghat. |
|
SMRITI CHANDRA KARMAKAR |
24/08/2023 |
₹599,269.00 |
04/10/2023 |
1473/ZP |
Not started |
120
|
MPLAD |
|
75 |
38-06-23-24 |
Repair and Maintenance of CC Approach of Sutail Slab Culvert near Nawgaon High School in P.S. Tapan. |
|
Somnath Kuiry |
21/08/2024 |
₹408,031.00 |
04/10/2023 |
1472/ZP |
Not started |
60
|
Repair and Maintenance |
|
76 |
38-04-23-24 |
Proposed Estimate for the repairing & renovation works at Block-A, Block-B & Block-C of Dakshin Dinajpur Zilla Parishad building, Balurghat, Dakshin Dinajpur, West Bengal. |
|
Nihar Ghosh |
21/08/2023 |
₹526,685.00 |
10/10/2023 |
1502/ZP |
Not started |
60
|
15th FC Supplementary (22-23) |
|
77 |
37-04-23-24 |
Repair and maintenance of Road from Bituminus Road to CPU for SWM of Chingishpur Gram Panchayat in P.S. Balurghat |
|
Somnath Kuiry |
21/08/2023 |
₹1,752,354.00 |
10/10/2023 |
1505/ZP |
Not started |
90
|
Repair & maintenance |
|
78 |
37-02-23-24 |
Construction of Covered Drain from Kachi Kacha School to Tut Farm Bridge East Side in Vill- mohona under Kumarganj PS.- 52228509 |
|
Somnath Kuiry |
20/08/2023 |
₹2,376,471.00 |
10/10/2023 |
1504/ZP |
Not started |
60
|
15th FC TIED (21-22) |
|
79 |
37-1-23-24 |
Construction of Cross Drain (vented causeway) at Jadukhari, Gachihar under Damdama GP in P.S. Gangarampur-76054529 |
|
Kalyan Bose |
21/08/2023 |
₹4,181,859.00 |
10/10/2023 |
1503/ZP |
Not started |
180
|
15th FC Supplementary (22-23) |
|
80 |
36-01-23-24 |
a) Supply of Material for Construction of Biogas Plant b) Construction of shed along with platform along with shed for installation of electrical and mechanical items c) Construction of Approach road for Biogas Plant & d) Construction of Fencing for Biogas Plant with Gate . |
|
PABAN BASAK |
17/08/2023 |
₹632,104.00 |
04/10/2023 |
1471/ZP |
Not started |
60
|
SBMG |
|
81 |
35-02-23-24 |
Proposed Estimate for the repairing & renovation works at Block-E of Dakshin Dinajpur Zilla Parishad building, Balurghat, Dakshin Dinajpur, West Bengal. - 87104648 |
|
PABAN BASAK |
08/08/2023 |
₹559,700.00 |
04/10/2023 |
1470/ZP |
Not started |
60
|
16th FC Supplementary (22-23) |
|
82 |
35-01-23-24 |
Proposed Estimate for the repairing & renovation works of Toilet Block at Dakshin Dinajpur Zilla _ Parishad building, Balurghat, Dakshin Dinajpur, West bengal. - 76055366 |
|
PABAN BASAK |
08/08/2023 |
₹161,036.00 |
04/10/2023 |
1469/ZP |
Not started |
60
|
15th FC Supplementary (22-23) |
|
83 |
23-05-23-24 |
Construction of Covered Drain from house of Sattar Miah towards pond of Jafrul vill- Boroidanga in Mahabari GP in P.S. Banshihari-58351249 |
|
Suhita Paul |
09/08/2023 |
₹970,976.00 |
04/10/2023 |
1468/ZP |
Not started |
60
|
15th FC TIED (22-23) |
|
84 |
34-03-23-24 |
Construction of Covered Drain from Ghoshpara Hari Mandir towards Sudha Kar House in P.S. Gangarampur-52229069 |
|
Kalyan Bose |
09/08/2023 |
₹1,164,360.00 |
04/10/2023 |
1467/ZP |
Not started |
60
|
15th FC TIED (21-22) |
|
85 |
34-01-23-24 |
Construction of Block Public Health Unit(BHPU) at Hili RH under Hili PS. |
|
Somnath Kuiry |
09/08/2023 |
₹5,648,657.00 |
04/10/2023 |
1466/ZP |
Not started |
365
|
XV FC Health Grant (2023-24) |
|
86 |
33-05-2023 |
Construction of Covered Drain from Badal Das House towards Culvert in Ganguria GP in P.S. Banshihari.-58363996 |
|
Suhita Paul |
08/08/2023 |
₹971,007.00 |
04/10/2023 |
1465/ZP |
Not started |
90
|
15th FC TIED (2022-23) |
|
87 |
32-02-23-24 |
Design, Development, Installation & Commissioning of Mechanical, Electrical and Instrumentation Item for operation of Biogas Plant and utilization of Biogas . |
|
PABAN BASAK |
26/07/2023 |
₹2,124,000.00 |
04/10/2023 |
1464/ZP |
Not started |
|
SBMG |
|
88 |
31-03-23-24 |
Construction of Covered Drain from Keshabpur FP School towards Ganesh house (Jahangirpur) in PS Gangarampur |
|
Kalyan Bose |
24/07/2023 |
₹2,328,783.00 |
04/10/2023 |
1463/ZP |
Not started |
70
|
15th FC 21-22 Tied |
|
89 |
2-04-23-24 |
Supply of Safe Drinking Water by Providing Water ATM at front side of Chaloon High School, Vill-Sahara/Chaloon, GP-Chaloon under Gangarampur PS-47380685 |
|
PABAN BASAK |
01/01/1970 |
₹547,564.00 |
08/05/2023 |
747/ZP |
27/05/2023 |
Scheme Completed: 02/09/2024 |
15th FC TIED (21-22) |
|
90 |
13-21-20-21 |
Constructin of community Toilet at Rampur Hat Khola in Harsura GP, Tapan PS |
|
PABAN BASAK |
30/12/2020 |
₹960,557.00 |
06/02/2021 |
322/ZP |
08/09/2021 |
Scheme Completed: 02/09/2024 |
15th FC TIED (20-21 |
|
91 |
60-04-22-23 |
Repair and Maintenance of Road from Madhu Malakar House to Narayan Deb House in vill-Belbari under Belbari GP in P.S. Gangarampur |
|
PABAN BASAK |
23/03/2023 |
₹445,588.00 |
04/05/2023 |
725/ZP |
03/06/2023 |
Scheme Completed: 02/09/2024 |
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
92 |
04-13-23-24 |
Supply and Installation of LED Solar Street Light Chakpara and Khalpara in P.S. Tapan, GP- Gofanagar, Dist- Dakshin Dinajpur.-58025679 |
|
Nihar Ghosh |
01/01/1970 |
₹322,294.00 |
01/01/1970 |
1208/ZP |
13/09/2023 |
Scheme Completed: 09/10/2023 |
15th FC UN TIED (2022-23) |
|
93 |
09-09-23-24 |
Construction of CC Road from Barabari to Chakpara at Ellahabad GP in P.S. Banshihari-5758813 |
|
Suhita Paul |
01/01/1970 |
₹971,151.00 |
01/01/1970 |
903/ZP |
12/07/2023 |
Scheme Completed: 07/09/2023 |
15th FC UN-TIED 22-23 |
|
94 |
30-09-23-24 |
Supply of Safe Drinking water by Providing Water ATM at near Rajkumar House(Solar Electrical work), GP-Gangu.ia under Banshihari P5-44811211 |
|
Nihar Ghosh |
19/07/2023 |
₹199,998.00 |
31/08/2023 |
1354/ZP |
Not started |
90
|
15th FC TIED (20-21) |
|
95 |
30-08-23-24 |
Supply of Safe Drinking water. by Providing Water ATM at near Singadha Nabarun Rural Library(Solar LEctrical Work), GP Ganguria under Banshihari P5-44811197 |
|
Nihar Ghosh |
19/07/2023 |
₹199,998.00 |
31/08/2023 |
1353/ZP |
Not started |
90
|
15th FC TIED (20-21) |
|
96 |
30-04-23-24 |
Construction of Covered Drain from Gopalpur Jiyaruddin House towards Najmul Mia House, Shirsi in P.S Harirampur-58355994 |
|
Kalyan Bose |
19/07/2023 |
₹972,026.00 |
31/08/2023 |
1352/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
97 |
30-03-23-24 |
Construction of covered drain from Majidur Shop towards Kali Mandir at Gopalpur, Ashokgram GP in P.S. Gangarampur-58345649 |
|
PABAN BASAK |
19/07/2023 |
₹485,437.00 |
31/08/2023 |
1351/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
98 |
30-02-23-24 |
Construction of covered Drain from Majidur Miah House towards Palpara under Dwipkhanda GP in P.S. Tapan-58335029 |
|
Somnath Kuiry |
19/07/2023 |
₹971,152.00 |
31/08/2023 |
1350/ZP |
Not started |
90
|
15th FC TIED (2022-23) |
|
99 |
29-01-23-24 |
Repair and Upgradation of Road from NH-512 at Ramkrishna Ashram, Balurghat to Correctional Home, Balurghat in Dist. Dakshin Dinajpur. |
|
PABAN BASAK |
19/07/2023 |
₹3,412,600.00 |
31/08/2023 |
1349/ZP |
Not started |
60
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
100 |
28-01-23-24 |
Construction of EVM Ware house(Three Storied) beside Minority building at Balurghat District Collectorate Campus, Dakshin Dinajpur, JL No-105, Plot No- 2703, Mouza-Dakra |
|
|
01/06/2023 |
₹11,897,248.00 |
09/08/2023 |
1244/ZP |
Not started |
365
|
EVM/VVPAT Warehouses Fund |
|
101 |
27-01-23-24 |
Installation of Drinking Water system at Shyamganj Das para, Saidpur under Harirampur P.S.-44811261 |
|
Kalyan Bose |
01/06/2023 |
₹543,656.00 |
08/08/2023 |
1240/ZP |
Not started |
60
|
15th FC TIED (20-21) |
|
102 |
25-17-23-24 |
Construction of Covered Drain from Chourangi Bishramagar east side towards Afjal Miah house in P.S. Kushmandi-58369699 |
|
Suhita Paul |
29/05/2023 |
₹727,955.00 |
08/08/2023 |
1239/ZP |
Not started |
90
|
15th FC TIED (2022-23) |
|
103 |
25-15-23-24 |
Installation of Drinking Water System at Dolgram, Karbala Math, Bagichapur under Harirampur PS.-47387364(Civil Portion only) |
|
Kalyan Bose |
29/05/2023 |
₹547,564.00 |
08/08/2023 |
1238/ZP |
Not started |
60
|
15th FC TIED (21-22) |
|
104 |
25-12-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Mahabul Miah at mouja-Sayedpur ,Sayedpur G.P. under Harirampur Block-66444178 |
|
Kalyan Bose |
29/05/2023 |
₹770,406.00 |
08/08/2023 |
1237/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
105 |
25-11-23-24 |
Drinking water facility in front side of Majhapara(Amtali) , Kushmandi , by Sinking and Installation 150mmX80mm tubewell (solar Operated) under 15th FC (Tied) Fund in PS- Kushmandi.-47391140 |
|
Nihar Ghosh |
29/05/2023 |
₹970,160.00 |
08/08/2023 |
1236/ZP |
Not started |
90
|
15th FC TIED (21-22) |
|
106 |
46-03-22-23 |
Construction of CC Road from Masjid via Soleman Mia House towards Ismail Sarkar Gochiar under Damdama GP in P.S. Gangarampur-57721006 |
|
Kalyan Bose |
10/02/2023 |
₹1,456,731.00 |
29/05/2023 |
961/ZP |
13/07/2023 |
45
Days Left:-452
|
15th FC UN-TIED (22-23) |
|
107 |
25-10-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Anchar ali Sarkar at mouja-Nichinta ,Harsura G.P. under Tapan Block-66443920 |
|
Nihar Ghosh |
29/05/2023 |
₹770,406.00 |
08/08/2023 |
1235/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
108 |
25-09-23-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Jaynal Mondal at Dipkhanda Mouza, Dipkhanda GP under Tapan Block.-66435447 |
|
Nihar Ghosh |
29/05/2023 |
₹770,406.00 |
08/08/2023 |
1234/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
109 |
25-04-23-24 |
Construction of covered drain from Sayedpur Shyamsundar Sarkar House to Kanailal Pond under Boaldar GP in P.S. Balurghat-58358811 |
|
PABAN BASAK |
29/05/2023 |
₹990,196.00 |
08/08/2023 |
1233/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
110 |
|
Construction of Building of Bisramagar infront of Saint Piter under Danga GP in P.S. Building-57805730 |
|
PABAN BASAK |
29/05/2023 |
₹273,910.00 |
08/08/2023 |
1232/ZP |
Not started |
60
|
15th FC TIED (22-23) |
|
111 |
25-02-23-24 |
Construction of covered drain from Subhash Gupta House towards Kujbihari Saha Mill, Bagichapur in P.S. Harirampur-58564179 |
|
Kalyan Bose |
29/05/2023 |
₹776,851.00 |
08/08/2023 |
1231/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
112 |
24-07-23-24 |
Installation of Solar Light in Dakshin DInajpur District area total No-125(one hundred twenty five only) |
|
Nihar Ghosh |
22/05/2023 |
₹3,143,416.00 |
01/09/2023 |
1360/ZP |
Not started |
90
|
MPLAD |
|
113 |
24-04-23-24 |
Construction of CC Road and Pilling from Ramash Mandal Pond and Shib Mandir to Sachin Roys House and Nijrul Sarkar House to FP School Kutubpur under Samjia GP in P.S. Kumarganj-57722937 |
|
Somnath Kuiry |
22/05/2023 |
₹1,942,308.00 |
08/08/2023 |
1230/ZP |
Not started |
90
|
15th FC UN-TIED (22-23) |
|
114 |
24-03-23-24 |
Repair and Maintenance of road from the House of Jishu Hasda to the Agricultural Land of Likhan Tudu at Shikarpur Gram of Sahapur Sansad No-07 Ramchandrapur GP in P.S. Tapan |
|
Somnath Kuiry |
22/05/2023 |
₹2,027,657.00 |
08/08/2023 |
1229/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
115 |
19-04-23-24 |
Drilling and Installation Light Duty Tube Well 150 mm x 80 mm (Solar & Electric Operated) (Civil Work) at 4 Nos. (No.2 Belbari, Katatoir, Samjia and Hili) under BADP fund in Dist- Dakshin Dinajpur. |
|
Somnath Kuiry |
12/05/2023 |
₹2,026,875.00 |
08/08/2023 |
1228/ZP |
Not started |
120
|
BADP |
|
116 |
19-03-23-24 |
Repair and maintenance of Itakhore towards Bagmari via Ukhail FP School under Bagichapur GP In P.S. Harirampur. |
|
Kalyan Bose |
12/05/2023 |
₹2,229,465.00 |
08/08/2023 |
1227/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
117 |
19-02-23-24 |
Repairing of Maintenance BT road from Badsankair Sukamal Basak House via Muslim Para to Nedor under Gofanagar GP in P.S. Tapan. |
|
Somnath Kuiry |
12/05/2023 |
₹1,980,392.00 |
08/08/2023 |
1226/ZP |
Not started |
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
118 |
|
Repairing of Maintenance road from Charail Krishnapur Pacca road to House of Manash Ray via Har Basar tala under Bhor GP in P.S. KUmarganj. |
|
Somnath Kuiry |
12/05/2023 |
₹1,165,385.00 |
08/08/2023 |
1225/ZP |
Not started |
90
|
Repair/Maintenance of Rural Roads other than Gramin Sadak Yojana |
|
119 |
17-02-23-24 |
Construction of Covered Drain from Raghunath Bati Culvert towards Sanjit Sarkar House under Damdama GP in P.S. Gangarampur-58563487 |
|
Kalyan Bose |
04/05/2023 |
₹1,514,908.00 |
08/08/2023 |
1224/ZP |
Not started |
45
|
15th FC TIED (22-23) |
|
120 |
25-12-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Mahabul Miah at mouja-Sayedpur ,Sayedpur G.P. under Harirampur Block-66444178 |
|
Nihar Ghosh |
29/05/2023 |
₹770,406.00 |
08/08/2023 |
1237/ZP |
23/08/2023 |
60
Days Left:-396
|
"15th FC TIED (2022-23)" |
|
121 |
57-22-22-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Saifur Rahaman at Branpara mouza (Chakdebibsa),Nandanpur G.P. under Gangarampur Block-66436666 |
|
Nihar Ghosh |
16/03/2023 |
₹770,406.00 |
16/05/2023 |
826/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
122 |
57-20-22-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Saidyhed Ali Shah at Damina mouza,Jahangirpur G.P. under Gangarampur Block-66443484 |
|
Nihar Ghosh |
16/03/2023 |
₹770,406.00 |
16/05/2023 |
824/ZP |
22/08/2023 |
60
Days Left:-397
|
15th FC TIED (2022-23) |
|
123 |
57-21-22-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Satendranath Roy at Jahangirpur mouja,Jahangirpur G.P. under Gangarampur Block-66436480 |
|
Nihar Ghosh |
16/03/2023 |
₹770,406.00 |
16/05/2023 |
825/ZP |
28/08/2023 |
60
Days Left:-391
|
15th FC TIED (2022-23) |
|
124 |
21-05-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Ganesh CH. Roys at mouja-Palashi ,Samjia G.P. under Kumarganj Block-66444254 |
|
Nihar Ghosh |
16/05/2023 |
₹770,406.00 |
19/07/2023 |
1121/zp |
17/08/2023 |
60
Days Left:-402
|
15th FC 21-22 Tied |
|
125 |
02-07-22-23 |
Construction of CC Road from Batun Bus Stand to Debhog via Raghunathpur in PS Kumarganj |
|
Somnath Kuiry |
20/04/2022 |
₹990,196.00 |
27/07/2022 |
771/ZP |
02/05/2023 |
Scheme Completed: 09/08/2023 |
15th FC Un-Tied 21-22 |
|
126 |
10-01-22-23 |
Construction of Road from SH-10 to Buniadpur Municipality Waste Disposal site in P.S. Banshihari. |
|
Suhita Paul |
04/07/2022 |
₹5,614,258.00 |
21/11/2022 |
1127/ZP |
19/04/2023 |
90
Days Left:-492
|
SUDA & ZP fund |
|
127 |
09-10-23-24 |
Repair and Maintenance of CC Road from Sihol Daral Hat to Sanjit Sarkar House to Chotosihol at Ellahabad GP in P.S. Banshihari. |
|
Suhita Paul |
19/04/2023 |
₹971,302.00 |
24/05/2023 |
904/ZP |
24/05/2023 |
Scheme Completed: 03/08/2023 |
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
128 |
09-07-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Amiya Prasad sarkar at mouja-Bhatpara Bhatpara G.P. under Balurghat Block-66447047 |
|
Nihar Ghosh |
19/04/2023 |
₹770,406.00 |
24/05/2023 |
901/ZP |
24/07/2023 |
60
Days Left:-426
|
15th FC TIED (2022-23) |
|
129 |
23-05-23-24 |
Supply and Fixing of Electrical Fittngs(Tube Light/Ceilling Fan/Exhaust Fan/Call bell) Public Health unit (BPHU) at Harirampur RH in Harirampur P.S. Dist-Dakshin Dinajpur |
|
Nihar Ghosh |
19/05/2023 |
₹160,782.00 |
19/07/2023 |
1137/ZP |
11/08/2023 |
Scheme Completed: 14/08/2023 |
XV FC-Health Grants for FY-2021-22 |
|
130 |
23-04-23-24 |
Supply and Fixing of Electrical Fittngs(Tube Light/Ceilling Fan/Exhaust Fan/Call bell) Public Health unit (BPHU) at Tapan RH in Tapan P.S. Dist-Dakshin Dinajpur |
|
Nihar Ghosh |
19/05/2023 |
₹160,782.00 |
19/07/2023 |
1136/ZP |
Not started |
30
|
XV FC-Health Grants for FY-2021-22 |
|
131 |
23-03-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Sahajan Mandal at mouja-Deor ,Deor G.P. under Kumarganj Block-66445699 |
|
Nihar Ghosh |
19/07/2023 |
₹770,406.00 |
19/07/2023 |
1135/ZP |
17/08/2023 |
60
Days Left:-402
|
15th FC TIED (2022-23) |
|
132 |
23-02-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Mangal Hasda at mouja-Kamarpara,Amritakhanda G.P. under Balurghat Block-66445557 |
|
Nihar Ghosh |
19/05/2023 |
₹770,406.00 |
19/07/2023 |
1134/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
133 |
22-09-23-24 |
Supply and Installation of LED Solar Street light at N/H of 1) Sonal Tudu,2) N/H of Rabi Tudu,3) N/H of Kandan Hemram,4) N/H of Prasanna Hemram, 5) N/H of Bishu Saren, 6) N/H of Mantu Hemram,7) N/H of Shikarpur FP School gate 8) N/H of Biswanath Murmu 9) N/H of Rabi Hasda 10) N/H of Somen Tudu 11) N/H of Likhan Tudu 12) N/H of Sukal Murmu. Block-Tapan GP-No-07 Ramchandrapur ,Dist-Dakshin Dinajpur 75942029 |
|
Nihar Ghosh |
01/05/2023 |
₹348,532.00 |
19/07/2023 |
1133/ZP |
11/08/2023 |
60
Days Left:-408
|
15th FC Supplementary (2022-23) |
|
134 |
22-08-23-24 |
Construction o CC Road from the ICDS Center(No-250) to the house of Singha Murmu in P.S. Tapan-75950722 |
|
Somnath Kuiry |
01/05/2023 |
₹388,280.00 |
19/07/2023 |
1132/ZP |
Not started |
60
|
15th FC Supplementary (2022-23) |
|
135 |
22-07-23-24 |
Construction of CC Road with 50 mtr. RCC Cover Drain from (ICDS center-250) the house of Sonal Tudu to the Agriculture Land of Sonal Tudu in P.S. Tapan-75944778 |
|
Somnath Kuiry |
01/05/2023 |
₹974,156.00 |
19/07/2023 |
1131/ZP |
Not started |
90
|
15th FC Supplementary (2022-23) |
|
136 |
22-06-23-24 |
Construction of covered Drain frpm Dudiya Kuri towards Hasnagar Uttar Para under Gofanagar GP in P.S. Tapan-58538162 |
|
Somnath Kuiry |
01/05/2023 |
₹874,039.00 |
19/07/2023 |
1130/ZP |
Not started |
90
|
15th FC TIED (2022-23) |
|
137 |
22-03-23-24 |
Supply and Installation of LED Solar Street Light at Kharuya Sashan in P.S. Harirampur, GP-Bagichapur, Dist- Dakshin Dinajpur.-57911391 |
|
Nihar Ghosh |
01/05/2023 |
₹0.00 |
19/07/2023 |
1129/ZP |
07/08/2023 |
Scheme Completed: 03/09/2023 |
15th FC TIED (2022-23) |
|
138 |
22-02-23-24 |
Supply and Installation of LED Solar Street Light at Chakbhagirath Adibasipara and Burakuri Sansad, Jamlabad(front side mijanur Sarkar house), Chamtakuri more in P.S. Tapan, GP-Ramchandrapur & Malancha, Dist- Dakshin Dinajpur-58044808 |
|
Nihar Ghosh |
01/05/2023 |
₹506,462.00 |
19/07/2023 |
1128/ZP |
11/08/2023 |
Scheme Completed: 22/08/2023 |
15th FC TIED (2022-23) |
|
139 |
22-01-23-24 |
Supply and Installation of LED Solar Street Light at Katabari in P.S.-Gangarampur, GP-Sukdevpur, Dist- Dakshin Dinajpur-57911122 |
|
Nihar Ghosh |
05/01/2023 |
₹0.00 |
07/12/2023 |
1127/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
140 |
21-13-23-24 |
Construction of Community Toilet at Gokulpur Bazar, Ashokgram in PS-Gangarampur-47393885 |
|
PABAN BASAK |
01/01/1970 |
₹541,881.00 |
19/07/2023 |
1126/ZP |
Not started |
90
|
15th FC TIED (21-22) |
|
141 |
21-12-23-24 |
Supply of Safe Drinking Water by Providing Water ATM at Pukurtala, GP-Uday under Gangarampur PS-47380375(Civil Portion only) |
|
Kalyan Bose |
16/05/2023 |
₹547,564.00 |
19/07/2023 |
1125/ZP |
Not started |
60
|
15th FC TIED (21-22) |
|
142 |
21-10-23-24 |
Installation of Drinking Water System near Mahendipara Police Camp Pundari under Harirampur PS-44811251 |
|
Kalyan Bose |
16/05/2023 |
₹547,564.00 |
19/07/2023 |
1124/ZP |
Not started |
60
|
15th FC TIED (20-21) |
|
143 |
21-07-23-24 |
Supply of Safe Drinking Water by Providing Water ATM at front side of Najibar Miah House in Masjit, Vill-Tetrahail, GP-Uday under Gangarampur PS.-52228835 |
|
PABAN BASAK |
16/05/2023 |
₹554,510.00 |
19/07/2023 |
1123/ZP |
Not started |
60
|
15th FC TIED (2021-22) |
|
144 |
21-06-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Bachu Mondal at mouja-Debipur ,Jakirpur G.P. under Kumarganj Block-66444312 |
|
Nihar Ghosh |
01/01/1970 |
₹770,406.00 |
19/07/2023 |
1122/ZP |
17/08/2023 |
60
Days Left:-402
|
15th FC TIED (2022-23) |
|
145 |
21-05-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Ganesh CH. Roys at mouja-Palashi ,Samjia G.P. under Kumarganj Block-66444254 |
|
Somnath Kuiry |
16/05/2023 |
₹770,406.00 |
19/07/2023 |
1121/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
146 |
21-03-23-24 |
Supply and Instalation of Mini .Mast Light with LED Flood Light fittings in front of Daulatpur Uttarpara Club under Banshihari Block. |
|
Suhita Paul |
16/05/2023 |
₹155,822.00 |
19/07/2023 |
1120/ZP |
Not started |
45
|
BEUP 42 No Harirampur LAC |
|
147 |
21-02-2023 |
Supply and Installation of Mini Mast Light with LED Flood Light fittings at Bataskuri Durgamandir Banshihari Block |
|
Suhita Paul |
16/05/2023 |
₹155,822.00 |
19/07/2023 |
1119/ZP |
Not started |
45
|
BEUP 42 No Harirampur LAC |
|
148 |
21-01-23-24 |
Supply and Installation of Solar Panel at Mahendra High School under Bairhatta GP in P.S. Harirampur. |
|
Kalyan Bose |
16/05/2023 |
₹199,259.00 |
19/07/2023 |
1118/ZP |
Not started |
45
|
BEUP 42 No Harirampur LAC |
|
149 |
20-06-23-24 |
Supply and Installation of LED Solar Street light at front side of Katkal TaTa Hat. Block-Kumarganj,GP-Bhour,Dist-Dakshin Dinajpur-58022964 |
|
Nihar Ghosh |
12/05/2023 |
₹505,168.00 |
19/07/2023 |
1117/ZP |
11/08/2023 |
Scheme Completed: 07/11/2023 |
15th FC –UN-TIED (22-23) |
|
150 |
20-05-23-24 |
Installation of Mini Mast with LED Solar Street light at Chaloon BPHC in P.S.-Gangarampur ,G.P.-Chaloon, Dist-Dakshin Dinajpur-57851846 |
|
Nihar Ghosh |
12/05/2023 |
₹506,897.00 |
19/07/2023 |
1116/ZP |
24/08/2023 |
60
Days Left:-395
|
15th FC –UN-TIED (22-23) |
|