301
50-05-2022-23
Repairing of Maintenance road from Goal Kuri Pacca road to ST Girja under Deor GP in P.S. Kumarganj
Somnath Kuiry
09/03/2023
₹971,154.00
25/04/2023
649/ZP
31/05/2023
Scheme Completed: 05/07/2023
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
302
50-04-2022-23
Repairing of Maintenance road from Jhara Karmatirtho to Jhara More(2nd phase) under Bhour GP in P.S. Kumarganj.
Somnath Kuiry
09/03/2023
₹693,137.00
25/04/2023
648/ZP
31/05/2023
Scheme Completed: 09/08/2023
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
303
50-02-2022-23
Repairing and Maintenance of Road from Gajen Sarkar House to Malancha Sub-Health Center with Protection work under Danga GP in P.S. Balurghat.
PABAN BASAK
09/03/2023
₹495,098.00
25/04/2023
647/ZP
Not started
45
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
304
50-01-2022-23
Repairing and Maintenance of Road from Krishnagar More Gopal Murmu House in GP Jalghar under Balurghat PS.
PABAN BASAK
09/03/2023
₹759,600.00
25/04/2023
646/ZP
31/05/2023
45
Days Left:-507
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
305
44-11-2022-23
Construction of Covered Drain from Chabi Bhattacharjee House to Mithun Orawn House in vill Hili under Hili PS.-58358093
PABAN BASAK
08/02/2023
₹990,196.00
26/04/2023
663/ZP
Not started
60
15th FC TIED (22-23)
306
49-20-2022-23
Construction of Cement Concrete Road from near Baptail Football Field to Langra Pukur More under GP Rampara Chanchara in P.S. Tapan. L- 1.23 KM
PABAN BASAK
23/02/2023
₹4,111,895.00
30/03/2023
495/ZP
14/04/2023
60
Days Left:-539
RASTASHREE 2023
307
49-18-2022-23
Construction of BT Road from Salash Paschimpara Milon Halder House to Biswanath House vill of Biswanathpur under Hajratpur GP in P.S. Tapan. L- 0.67 KM
Somnath Kuiry
23/03/2023
₹1,996,213.00
24/03/2023
445/ZP
Not started
90
RASTASHREE 2023
308
49-17-2022-23
Construction of CC Road from Bhagait Joute Godown to Satish Tirki House vill of Bhagait under Hajratpur GP in P.S. Tapan. L- 0.67 KM
Somnath Kuiry
23/02/2023
₹2,127,269.00
22/03/2023
387/ZP
31/03/2023
Scheme Completed: 06/08/2023
RASTASHREE 2023
309
49-16-2022-23
Construction of CC Road from Polo Roy to Salga Nimesh Roy House vill of Ghatika under Gurail GP in P.S. Tapan. L- 1.34 KM
Somnath Kuiry
23/02/2023
₹4,491,828.00
30/03/2023
494/ZP
05/04/2023
Scheme Completed: 16/08/2023
RASTASHREE 2023
310
49-15-2022-23
Construction of Metal Road from Alinagar Battala to Puthai Para, vill of Jajier under Dwipkhanda GP In P.S. Tapan. L-1.31 KM
Somnath Kuiry
23/02/2023
₹3,795,685.00
24/03/2023
444/ZP
Not started
90
RASTASHREE 2023
311
49-14-2022-23
Construction of BT Road from Mission More to Khayer Bari village of Chakbalaram under Gofanagar GP in P.S. Tapan. L-1.20 KM
Somnath Kuiry
23/02/2023
₹3,593,112.00
30/03/2023
496/ZP
05/04/2023
Scheme Completed: 11/10/2023
RASTASHREE 2023
312
49-13-2022-23
Construction of CC Road from Kaikuri to Dharampur Kalitala via Mangal Mandal House, Dharampur under Saiyedpur GP in P.S. Harirampur.L-0.71 KM
Kalyan Bose
23/02/2023
₹2,474,660.00
22/03/2023
386/ZP
Not started
60
RASTASHREE 2023
313
49-08-2022-23
Construction of CC Road from House of Bifal Mahato via Bhitor Mousum via Dangapara to Buripukur, Vill-Bhitor Masum, GP-Barjaballavpur in P.S. Tapan. L- 1.23 KM
Suhita Paul
23/02/2023
₹3,970,199.00
30/03/2023
491/ZP
Not started
60
RASTASHREE 2023
314
49-07-2022-23
Construction of Road from Khosalput Albenus Murmu House to Thola Village under Rampara CHenchar GP in P.S. Tapan. L-1.30 KM
PABAN BASAK
23/02/2023
₹4,029,699.00
30/03/2023
490/ZP
Not started
90
RASTASHREE 2023
315
49-06-2022-23
Construction of Road from Kasba Bator Kabor Chara to Baruni Mala under Rampara Chenchra GP in P.S. Tapan. L-1.96 KM
PABAN BASAK
23/02/2023
₹6,037,800.00
24/03/2023
442/ZP
Not started
90
RASTASHREE 2023
316
49-05-2022-23
Construction of Metal road from Sattar Sarkar house to Khochha Pukur Darga Para,Village of Tarail under Ramchandrapur GP in P.S.Tapan.L-1.33 KM
Somnath Kuiry
23/02/2023
₹4,391,520.00
30/03/2023
489/ZP
05/04/2023
Scheme Completed: 09/10/2023
RASTASHREE 2023
317
49-04-2022-23
Construction of Metal road from Akhira Danga F.P.School to Naya Para Kabar Chara,Village of Ramchandrapur under Ramchandrapur GP in P.S.Tapan.L-1.56 KM
Somnath Kuiry
23/02/2023
₹5,429,047.00
22/03/2023
385/ZP
05/04/2023
90
Days Left:-518
RASTASHREE 2023
318
49-03-2022-23
Construction of Metal road from House of Mansur Kabiraj to Dakatpara,Village of Malahar under Harsura GP in P.S.Tapan.L-1.36KM
Somnath Kuiry
23/02/2023
₹5,755,845.00
24/03/2023
437/ZP
Not started
90
RASTASHREE 2023
319
49-02-22-23
Construction of CC Road from Hardail Para to house of Amrita Barman,village of Mahadebpur under Dwipkhanda G.P. in P.S.Tapan.L-1.2 KM
Somnath Kuiry
23/02/2023
₹3,721,289.00
30/03/2023
488/ZP
05/04/2023
Scheme Completed: 02/08/2023
RASTASHREE 2023
320
37-11-2022-23
Construction of SRISHTISHREE Counter at Balurghat(Gr. Floor of DRDC) in Dist. Dakshin Dinajpur
PABAN BASAK
19/01/2023
₹1,297,519.00
14/03/2023
323/ZP
Not started
180
WBSRLM
321
37-10-2022-23
Maintenance of road by providing covered drain from NH-512 to House of Sunil Sarkar(Kamar Bura) under Damdama GP in P.S. Gangarampur.
Kalyan Bose
19/01/2023
₹733,845.00
14/03/2023
322/ZP
Not started
45
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
322
37-08-2022-23
Repair and Maintenance of Road from Sewai Main Road to Kaitara in P.S. Kumarganj
Somnath Kuiry
19/01/2023
₹5,431,106.00
05/04/2023
541/ZP
Not started
45
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
323
37-06-2022-23
Repairing of Road from Poragachi Amulys Sarkar House towards Akhiradanga Bridge in P.S. Tapan.
Somnath Kuiry
19/01/2023
₹1,845,192.00
15/03/2023
339/ZP
20/04/2023
Scheme Completed: 09/06/2023
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
324
37-05-2022-23
Construction of Covered Drain from Sayedpur Madhapara Afsarul Islam towards Jahidul Islam house via PHE more under Sayedpur GP in P.S. Harirampur.47400443
Kalyan Bose
19/01/2023
₹1,941,748.00
14/03/2023
320/ZP
28/04/2023
45
Days Left:-540
15th FC 2021-22 TIED Fund
325
37-04-2022-23
Construction of Covered Drain from Shyamnagar Faijul Mondal Pond to Mayuddin Mia Land under Deor GP in P.S. Kumarganj.-47404610
Somnath Kuiry
19/01/2023
₹495,098.00
14/03/2023
319/ZP
Not started
45
15th FC 2021-22 TIED Fund
326
37-03-2022-23
Construction of Covered Drain from Bhola Sarkar House to Football Filed(near Khari) in ]Vill-Azadpur under Safanagar GP in P.S. Kumarganj.-47405583
Somnath Kuiry
19/01/2023
₹594,118.00
14/03/2023
318/ZP
Not started
45
15th FC 2021-22 TIED Fund
327
39-04-2022-23
Construction of CC Road from Khagra Khari towards Narosingha Mandir, Kushmandi Akcha Goalgoan-57728147
Suhita Paul
19/01/2023
₹2,427,885.00
05/04/2023
540/ZP
Not started
45
15th FC UN-TIED (22-23)
328
39-01-2022-23
Construction of CC Road from Uttar Joypur Dilip Roy(Kathaltala) towards Bolla Mandir under Belbari-I GP in P.S. Gangarampur.57583206
Kalyan Bose
19/01/2023
₹1,748,077.00
14/03/2023
325/ZP
03/04/2023
45
Days Left:-565
15th FC UN-TIED (22-23)
329
49-11-2022-23
Construction of CC Road from House of Isha Haque to Panjaripara to Mahabri Adibasi Para, Vill-Mahabari, GP-Mahabari in P.S. Banshiahri.L-1.19 KM
Suhita Paul
23/02/2023
₹3,984,032.00
30/03/2023
493/ZP
13/04/2023
Scheme Completed: 12/10/2023
RASTASHREE 2023
330
49-10-2022-23
Construction of CC Road from House of Jadab Dealer at Gunjaripara to Choto Karai Vill- Ellahbad, Abutaher, GP-Ellahabad in P.S. Banshihari. L-0.87 KM
Suhita Paul
23/02/2023
₹2,929,353.00
24/03/2023
443/ZP
24/04/2023
Scheme Completed: 24/07/2023
RASTASHREE 2023
331
49-09-2022-23
Construction of CC Road from House of Bachhu Mandal at Badalpur via Chakpara to House of Niranjan Roy, Vill-Badalpur, Kelna, GP-Brajaballavpur in P.S. Banshiahri. L-0.80 KM
Suhita Paul
23/02/2023
₹2,264,241.00
30/03/2023
492/ZP
17/07/2023
Scheme Completed: 10/10/2023
RASTASHREE 2023
332
49-01-2022-23
Repairing of Metal road from Dhainagar More to House of Sishir Sarkar via Dhainagar High School,Village of Dhainagar under Tapan Chandipur GP in P.S.Tapan.L-1.13 KM
Somnath Kuiry
23/02/2023
₹1,871,104.00
24/03/2023
436/ZP
31/03/2023
Scheme Completed: 30/06/2023
RASTASHREE 2023
333
47-20-2022-23
Construction of Mukta Mancha at Belbari High School under Belbari-I GP in P.S. Gangarampur-57802028
PABAN BASAK
23/02/2023
₹548,248.00
04/04/2023
527/ZP
Not started
60
15th FC UN-TIED (22-23)
334
47-19-2022-23
Construction of Mukta Mancha at Phool Bari High School under Uday GP in P.S. Gangarampur-57802804
PABAN BASAK
23/02/2023
₹513,942.00
04/04/2023
526/ZP
Not started
90
15th FC UN-TIED (22-23
335
47-14-2022-23
Supply of Safe Drinking Water by Providing Water ATM at front side of Madrasha More, Vill-Chera Para(Solar Electrical Work), GP-Basuria under Gangarampur PS-47380574.
PABAN BASAK
23/02/2023
₹199,998.00
04/04/2023
525/ZP
Not started
90
15th FC TIED (21-22)
336
47-13-2022-23
Supply of Safe Drinking Water by Providing Water ATM at front side of Madrasha More, Vill-Chera Para, GP-Basuria under Gangarampur PS-47380574.
PABAN BASAK
23/02/2023
₹332,702.00
04/04/2023
524/ZP
Not started
60
15th FC TIED (21-22)
337
47-07-2022-23
Supply of Safe Drinking Water by Providing Water ATM at front side of Gopal Member House at Fayespur, Vill-Hakendar/Fayespur(Solar Electrical Work), GP_Jahangirpur under Gangarampur PS-47380753
Suhita Paul
23/02/2023
₹199,998.00
04/04/2023
523/ZP
Not started
90
15th FC TIED (20-21)
338
47-07-2022-23
Supply of Safe Drinking Water by Providing Water ATM at near Rajkumar House, GP-Ganguria under Banshihari PS-44811211
Suhita Paul
23/02/2023
₹347,566.00
04/04/2023
522/ZP
Not started
90
15th FC TIED (20-21)
339
47-03-2022-23
Supply of Safe Drinking Water by Providing Water ATM at near Singadha Nabarun Rural Library, GP-Ganguria under Banshihari PS-44811197
Suhita Paul
23/02/2023
₹347,566.00
04/04/2023
521/ZP
Not started
90
15 FC 20-21 Tied
340
46-09-2022-23
Repair and Maintenance of Road from Jora Mill(NH-512) towards Banhar Battala in Bolla GP under Balurghat PS
PABAN BASAK
10/02/2023
₹1,786,875.00
01/01/1970
506/ZP
17/04/2023
45
Days Left:-551
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
341
46-07-2022-23
Construction of Covered Drain from Saifuddin Sarkar House to Adibashipara in P.S. Tapan.-47402011
Somnath Kuiry
10/02/2023
₹1,456,731.00
30/03/2023
505/ZP
Not started
45
15th FC 2021-22 TIED Fund
342
46-08-2022-23
Construction of Covered Drain from Puntair Hat Pakka Road towards GP Office via Health Center in P.S. Kumarganj.-58333864
Somnath Kuiry
10/02/2023
₹1,456,731.00
30/03/2023
504/ZP
01/08/2023
Scheme Completed: 11/10/2023
15th FC -TIED (22-23)
343
46-05-2022-23
Construction of Covered Drain from Puntair Hat Pakka Road towards GP Office via Health Center in P.S. Kumarganj.-58333864
Kalyan Bose
10/02/2023
₹1,456,731.00
30/03/2023
504/ZP
Not started
45
15th FC -TIED (22-23)
344
46-04-2022-23
Construction of CC Road with Pilling Jhara Madrasha towards Abdul Rasid Miah House in P.S. Kumarganj-57576749
Somnath Kuiry
10/02/2023
₹1,456,731.00
30/03/2023
502/ZP
Not started
45
15th FC UN-TIED (22-23)
345
46-02-2022-23
Construction of CC Road from Jamdanga via Digdigimore towards Sampura under Chaloon GP in P.S. Gangarampur.- 66435121
PABAN BASAK
10/02/2023
₹1,748,077.00
30/03/2023
501/ZP
12/04/2023
45
Days Left:-556
15th FC UN-TIED (22-23)
346
45-14-2022-23
Construction of CC Road from Patra Gram More to Noyapara Gram at Banshiahri PS, Noapara-57591145
Suhita Paul
08/02/2023
₹388,462.00
22/03/2023
400/ZP
05/04/2023
Scheme Completed: 18/05/2023
15th FC UN-TIED (22-23)
347
45-13-2022-23
Construction of CC Road from House of Suman Biswas towards Mafij Miah in P.S. Tapan.-57729024
Somnath Kuiry
08/02/2023
₹971,154.00
22/03/2023
399/ZP
24/04/2023
Scheme Completed: 29/08/2023
15th FC UN-TIED (22-23)
348
45-10-2022-23
Construction of Community Toilet and Drinking Water Facility at Fulbari Market under Uday GP in P.S. Gangarampur. ( 47396021)
PABAN BASAK
08/02/2023
₹970,771.00
22/03/2023
398/ZP
Not started
120
15th FC TIED (21-22
349
45-09-2022-23
Construction of Community Toilet at Mission More Pundari in P.S. Harirampur-44811658
Kalyan Bose
08/02/2023
₹968,691.00
22/03/2023
397/ZP
Not started
120
"15th FC TIED (20-21"
350
45-08-2022-23
Construction of Community Toilet & Drinking W0ater Facility At Sekdevpur GP in P.S. Gangarampur.-47396250
PABAN BASAK
08/02/2023
₹970,771.00
22/03/2023
396/ZP
Not started
120
"15th FC TIED (21-22)"
351
45-07-2023
Drinking Water facility near Anchal Office, Kushmandi by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Kushmandi-44811422
Suhita Paul
08/02/2023
₹970,160.00
22/03/2023
395/ZP
24/05/2023
Scheme Completed: 17/10/2023
"15th FC TIED (20-21) "
352
45-06-2022-23
Solar Based over Head Drinking Water Facility in front Side of mahibal Miah House , Benial under Pundari in P.S. Harirampur-47391628
Kalyan Bose
08/02/2023
₹962,961.00
22/03/2023
394/ZP
Not started
120
15th FC TIED (21-22)
353
45-05-2022-23
Drinking Water facility in front side of Jambari, Kushmandi by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Kushmandi-47389971
Suhita Paul
08/02/2023
₹970,160.00
22/03/2023
393/ZP
29/05/2023
Scheme Completed: 17/10/2023
15 FC 21-22 Tied
354
45-04-2022-23
Construction of Covered Drain from Mangalpur Adibashi High School in P.S. Kushmandi.- 58368016
Suhita Paul
08/02/2023
₹728,365.00
22/03/2023
392/ZP
29/03/2023
Scheme Completed: 14/06/2023
15 FC 22-23 Tied
355
45-03-2022-23
Construction of Cover Drain from Mahipal Bazar to Mahipal Dighi in P.S. Kushmandi.-58362025
Suhita Paul
08/02/2023
₹728,365.00
22/03/2023
391/ZP
24/07/2023
Scheme Completed: 10/10/2023
15 FC 22-23 Tied
356
45-03-2023
Construction of Community Sanitary Complex(CSC) at Niren Smriti Vidyapith in Vill-Narayanpur GP-Belbari-II under Gangarampur PS.-58591132
Kalyan Bose
08/02/2023
₹990,196.00
22/03/2023
390/ZP
Not started
90
15 FC 22-23 Tied
357
45-01-2022-23
Construction of Community Sanitary Complex(CSC) at font side of Chaloon Bazar Bes-an-Noor Model School in Vill- Pransagar GP-Chaloon under Gangarampur PS.-58580207
PABAN BASAK
08/02/2023
₹990,196.00
22/03/2023
389/ZP
Not started
90
15 FC 22-23 Tied
358
44-15-2022-23
Construction of Community Sanitary Complex(CSC) at front side of Bolla Mandir in GP-Bolla under Balurghat PS-58577173
PABAN BASAK
20/01/2023
₹990,196.00
30/03/2023
500/ZP
Not started
90
15 FC 22-23 Tied
359
44-14-2022-23
Construction of Community Sanitary Complex at front side of Kumarganj Bus Stand GP-Ramkrishnapur in P.S. Kumarganj-58575520
Somnath Kuiry
08/02/2023
₹970,874.00
20/03/2023
374/ZP
Not started
90
15 FC 22-23 Tied
360
44-13-2022-23
Construction of Community Sanitary Complex(CSC) at front side of Hili Hospital in Panjul GP under Hili P.S.-58573934
PABAN BASAK
08/02/2023
₹990,195.00
20/03/2023
373/ZP
Not started
90
15 FC 22-23 Tied
361
44-08-2022-23
Construction of Covered Drain from Biswanath Murmu House to Samad Ali Mondal House in vill-Kharail under Jalghar GP in P.S. Balurghat.-58359744
PABAN BASAK
08/02/2023
₹495,098.00
20/03/2023
371/ZP
04/04/2023
60
Days Left:-549
15 FC 21-22 Tied
362
44-06-2022-23
Supply of Safe Drinking Water by Providing Water ATM at Front Side of Badalpur SS High School, Vill-Badalpur, Bolla in P.S. Balurghat.-47380808
PABAN BASAK
08/02/2023
₹544,608.00
30/03/2023
498/ZP
Not started
90
15 FC 21-22 Tied
363
44-10-2022-23
Construction of Covered Drain from Mofajal Miah Shop via School to Bidhan’s Shop under Ashokegram GP in P.S. Gangarampur.-58342297
PABAN BASAK
08/02/2023
₹485,437.00
30/03/2023
499/ZP
01/06/2023
90
Days Left:-461
15 FC 22-23 Tied
364
44-08-2022-23
Supply of Safe Drinking Water by Providing Water ATM at Front side of Manail Jr. High School, Vill- Manail, Patiram under Balurghat PS.-47383907
PABAN BASAK
08/02/2023
₹544,608.00
20/03/2023
371/ZP
11/04/2023
90
Days Left:-512
15 FC 21-22 Tied
365
44-6-2022-23
Repair and Maintenance Work of Building(Ground Floor repair) at Kushmandi Old Market Complex at Kushmandi -47462280
Suhita Paul
08/02/2023
₹485,195.00
20/03/2023
370/ZP
27/03/2023
90
Days Left:-527
15 FC 21-22 Un-tied
366
44-5-2022-23
Construction of Community Toilet at Barahar More in GP-Ramkrishnapur under Kumarganj PS-47394715
Somnath Kuiry
02/08/2023
₹990,196.00
20/03/2023
369/ZP
Not started
180
15 FC 21-22 Tied
367
44-4-2022-23
Construction of Community Toilet at Kamalpur Hat in Gopalbati GP under Balurghat PS-44811559
PABAN BASAK
01/02/2023
₹990,196.00
03/02/2023
368/ZP
Not started
180
15 FC 21-22 Tied
368
44-3-2022-23
Construction of Community Toilet at Baul Bazar in GP- Bolla under Balurghat 47396132
PABAN BASAK
01/02/2023
₹990,196.00
03/02/2023
368/ZP
Not started
180
15 FC 21-22 Tied
369
44-2-2022-23
Construction of Covered Drain from Mahijuddin Mia House to Khari in vill Khaspara under Bhor GP in P.S. Kumarganj.- 47404275
Somnath Kuiry
01/02/2023
₹792,157.00
03/02/2023
367/ZP
Not started
90
15 FC 21-22 Tied
370
44-01-2022-23
Construction of Covered Drain from Safanagar GP Office to Samar Basak Shop under Safanagar GP in P.S. Kumarganj.- 47404538
Somnath Kuiry
02/08/2023
₹495,098.00
03/02/2023
369/ZP
Not started
15 FC 21-22 Tied
371
26-10-2022-23
CC Road from Kalimandir more(Haran Saha House) towards Ashit Das Pukur under Belbari-I in P.S. Gangarampur.
Kalyan Bose
08/12/2023
₹758,636.00
10/02/2023
177/ZP
15/02/2023
90
Days Left:-567
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
372
26-09-2022-23
Repairing of Cc Road from Bharani Roy House to Biplab Roy House under Belbari-I GP in P.S. Gangarampur
PABAN BASAK
08/12/2022
₹435,709.00
10/02/2023
76/ZP
12/02/2023
60
Days Left:-600
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
373
26-08-2022-23
Repair and Maintenance of Wooden Foot Bridge with approach road at Uttar Belbari near Jr. Basic School(over Brahmani) under Belbari-I GP in P.S. Gangarampur.
Kalyan Bose
08/12/2022
₹600,400.00
10/02/2023
175/ZP
Not started
60
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
374
26-06-2022-23
Repairing and maintenance of road from Samsuddin House to Lohar Bridge(East Harsura) in P.S. Tapan.
08/12/2022
₹1,942,308.00
10/02/2023
174/ZP
Not started
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
375
26-05-2022-23
Repairng of CC Road from Dahapara to Dahapara Masjid(Dumuta) under Ashokgram GP in P.S. Gangarampur.
PABAN BASAK
08/12/2022
₹971,292.00
10/02/2023
173/ZP
06/03/2023
90
Days Left:-548
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
376
26-04-2022-23
Reparing of Road from Adigram end towards Nehemba in P.S. Gangarampur
Kalyan Bose
08/12/2022
₹4,252,501.00
10/02/2023
172/ZP
06/06/2023
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
377
26-03-2022-23
Repairing of Road from Kushmandi to Ushaharan in P.S. Kushmandi.
Suhita Paul
12/08/2022
₹2,618,165.00
10/03/2023
302/ZP
Not started
90
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
378
26-02-2022-23
Repairing of CC Road from Sudhir Roy House to Bhabesh Dutta Shop under Belbari-II GP in P.S. Gangarampur
Kalyan Bose
08/12/2022
₹3,810,661.00
23/02/2023
247/ZP
02/03/2023
90
Days Left:-552
Repair & Maintenance of rural roads other than Gramin Sadak Yojana
379
21-08/2022-23
Construction of Boundary Wall at Nil Gambhir FP School under Bairhatta GP in P.S. Harirampur.
Kalyan Bose
08/03/2022
₹776,424.00
12/12/2022
1221/ZP
24/02/2023
90
Days Left:-558
15th FC Savings (20-21)
380
43-02-2022-23
Setting up of IP Based Video Conferencing System by DDZP.
Nihar Ghosh
10/02/2023
₹733,635.00
03/03/2023
286/ZP
29/03/2023
Scheme Completed: 04/04/2023
RGSA Plan 22-23
381
42-01-2022-23
Upgradation of Road from Hili Bus Stand to Hili Check post under Hili P.S.
PABAN BASAK
01/02/2023
₹7,038,468.00
09/03/2023
296/ZP
07/04/2023
180
Days Left:-426
DM Office(available fund)
382
42-02-2022-23
Construction of CC road over damaged B.T. road from Belbari high school towards Dilu Dutta tea shop and widening of adjacent Ghosh para approach road in PS.- Gangarampur.
Kalyan Bose
01/02/2023
₹3,095,849.00
09/03/2023
295/ZP
14/03/2023
45
Days Left:-585
Repair maintenance of rural road
383
03-02-2022-23
Construction of CC Road from Pulin Barman house via Kera Barman house to Chukatu Barman house under Damdama GP in PS Gangarampur
Kalyan Bose
20/04/2022
₹2,330,590.00
11/04/2022
1068/ZP
10/12/2022
75
Days Left:-649
15th FC 2021-2022 Un-tied
384
41-07-2022-23
Supply and Installation of LED Solar Street Light at Araji Elamtair, Harikuri, Haridaspur, Paikpara, Block- Gangarampur, GP-Jahangirpur, Dist- Dakshin Dinajpur.-58047478
Nihar Ghosh
20/01/2023
₹460,420.00
02/03/2023
2801/ZP
11/03/2023
Scheme Completed: 20/04/2023
15th FC UN-TIED (22-23)
385
41-06-2022-23
Supply and Installation of LED Solar Street Light at Khaspur Atriyee River Bridge, Patiram Atrayee River Bridge, Mallickpur Village(Daktar Khana More) to Goutam Sarkar House and Arabinda Mandal House to Basanti Tala, Block-Balurghat, Bolla, Patiram, Najirpur GP, Dist- Dakshin Dinajpur-58043944
Nihar Ghosh
20/01/2023
₹460,420.00
02/03/2023
279/ZP
15/04/2023
Scheme Completed: 27/04/2023
15th FC UN-TIED (22-23)
386
41-05-2022-23
Installation of Solar Street Light inside of Malancha Madrasha Field and Fasiur Sarkar House to Malancha Madrasha Road side, Block-Tapan, Hazaratpur GP, Dist- Dakshin Dinajpur.-58028617
Nihar Ghosh
20/01/2023
₹644,587.00
02/03/2023
278/ZP
12/03/2023
Scheme Completed: 20/03/2023
15th FC UN-TIED (22-23)
387
41-04-2022-23
Supply and Installation of LED Solar Street Light at Kesor Kuri and Ejinagar Block-Tapan, Gofanagar GP Dist- Dakshin Dinajpur-58025103
Nihar Ghosh
20/01/2023
₹460,420.00
02/03/2023
277/ZP
16/03/2023
Scheme Completed: 08/04/2023
15th FC UN-TIED (22-23)
388
41-03-2023
Supply and Installation of LED Solar Street Light at Gopal ganj Bus Stand to Kumarganj Bus Stand, Block-Kumarganj, Safanagar/Ramkrishnapur GP Dist- Dakshin Dinajpur-58024409
Nihar Ghosh
20/01/2023
₹644,587.00
02/03/2023
276/ZP
15/03/2023
Scheme Completed: 13/04/2023
15th FC UN-TIED (22-23)
389
41-02-2022-23
Supply and Installation of LED Solar Street Light at Dhop Para to Karmakar Para via Chatma to Biprobhag, Block-KUmarganj, Deor-GP, Dist- Dakshin Dinajpur-58023704
Nihar Ghosh
20/01/2023
₹644,587.00
02/03/2023
275/ZP
15/03/2023
Scheme Completed: 28/03/2023
60
390
41-01-2022-23
Supply and Installation of LED Solar Street Light at Belbari different place, Singforka, Belbari, Joypur Manash Mondal House, Sunil Sarkar House, Shealkuri Sashan, Kacharipara, Narayan Debnath, Shymal Mondal, Hariya Saka Sashan Ghat, Hariranjan Roy House, Horesh Roy, Biplab Roy, Sing Para Block- Gangarampur, Belbari-I GP, Dist- Dakshin Dinajpur-57855667
Nihar Ghosh
20/01/2023
₹644,587.00
02/03/2023
274/ZP
07/03/2023
Scheme Completed: 18/03/2023
60
391
19-12-2022-23
Construction of Cc Road from Vaktipur Masjit to Kahotala(Kalitala more) under Chaloon GP in P.S. Gangarampur-47406614.
PABAN BASAK
24/08/2022
₹485,434.00
02/03/2023
281/ZP
23/04/2023
90
Days Left:-500
15th FC 2021-22 UN-TIED Fund
392
38-09-2022-23
Supply of Drinking Water by Providing Submersible Pump at Mohini Para Sashan Ghat, Dakshin Joypur under Belbari-I GP in P.S. Gangarampur.- 47392775
PABAN BASAK
21/12/2022
₹182,936.00
15/02/2023
197/ZP
Not started
60
15th FC TIED 20-21
393
32-08-2022-23
Supply of Drinking Water by Providing Submersible Pump at Pandey Para Sashan Ghat, Dakshin Joypur under Belbari-I GP in P.S. Gangarampur.- 47392200
PABAN BASAK
21/12/2022
₹182,936.00
15/02/2022
196/ZP
Not started
60
15th FC TIED 20-21
394
32-04-2023
Construction of Community Toilet at Baul Bazar in GP- Bolla under Balurghat 47396132
PABAN BASAK
21/12/2022
₹1,366,470.00
15/02/2022
195/ZP
Not started
90
15th FC UN TIED 21-22
395
29-01-2022-23
Construction of Public Health Units(BPHUs) at Harirampur RH(C) Internal Electrification work.
Nihar Ghosh
16/12/2022
₹353,698.00
15/02/2023
193/ZP
23/02/2023
Scheme Completed: 03/07/2023
XV FC-Health Grants for FY-2021-22
396
33-03-2022-23
Installation of LED Street Light(High Mast) at Barahar BPHC at Safanagar GP in P.S. Kumarganj Dist- Dakshin Dinajpur.
Nihar Ghosh
22/12/2023
₹602,115.00
15/02/2023
206/ZP
15/03/2023
Scheme Completed: 20/05/2023
15th FC Un-TIED-2020-21(supplementary)
397
33-01-2022-23
Repairing of High and Mini Mast (Electrical) Light in different block, GP and Villages, (Fulbari, Bagichapur, Kushmandi, Bairahatta, Gacchiar, Deor etc)-14 nos. Dist- Dakshin Dinajpur
Nihar Ghosh
22/12/2023
₹1,415,942.00
15/02/2023
205/ZP
07/03/2023
Scheme Completed: 10/05/2023
15th FC Un-TIED-2020-21(supplementary)
398
38-09-2022-23
Construction of Community Sanitary Complex at front side of Raikhand Khariji Madrasha GP Jakirpur in P.S. Kumarganj.-58587207
Somnath Kuiry
19/01/2023
₹970,874.00
15/02/2023
204/ZP
Not started
45
15th FC TIED (22-23)
399
40-01-2023
Construction of Covered Drain from Gombhira Tola towards Sarsa Pond in P.S. Tapan.-58338963
Somnath Kuiry
19/01/2023
₹728,365.00
15/02/2023
203/ZP
18/04/2023
Scheme Completed: 30/06/2023
15th FC TIED (22-23)
400
38-09-2022-23
Construction of CC Road from Jafarail Molla House to Jharpukur via Sayastabad Altab Miah House, Banshihari, Ganguria Goyalkuri/Sayastabad-57729446
Suhita Paul
19/01/2023
₹971,154.00
23/02/2023
249/ZP
23/04/2023
Scheme Completed: 26/06/2023
15th FC UN-TIED (22-23)
401
38-07-2022-23
Construction of CC Road from Amal Ch. Mandal House towards Hamidur Sarkar House via Mafijuddin Miah in P.S. Tapan.-57719285
Somnath Kuiry
19/01/2023
₹971,154.00
15/02/2023
201/ZP
21/03/2023
Scheme Completed: 19/05/2023
15th FC UN-TIED (22-23)
402
38-04-2022-23
Construction of CC Road from Palbhabanipur Footbal Math to Madan Barman House under Sayedpur GP in P.S. Harirampur.-57721927
Kalyan Bose
19/01/2023
₹679,808.00
23/02/2023
248/ZP
27/02/2023
Scheme Completed: 12/06/2023
15th FC UN-TIED (22-23)
403
38-03-2022-23
Construction of CC Road from HARIBASAR VIA Karno Barman House to Budhu Barman House under Gokarno GP in P.S. Harirampur.-57721561
Kalyan Bose
19/01/2023
₹970,717.00
15/02/2023
199/ZP
20/02/2023
45
Days Left:-607
15th FC UN-TIED (22-23)
404
38-02-2022-23
Construction of CC Road from Sing Para towards Khichuripara under Belbari-I in P.S. Gangarampur.
Kalyan Bose
19/01/2023
₹971,154.00
15/02/2023
198/ZP
16/02/2023
Scheme Completed: 12/06/2023
15th FC UN-TIED (22-23)
405
29-02-2022-23
Construction of Public Health Units(BPHUs) at Tapan RH(C) Internal Electrification work.
Nihar Ghosh
16/12/2022
₹353,698.00
15/02/2023
194/ZP
23/02/2023
Scheme Completed: 09/08/2023
XV FC-Health Grants for FY-2021-22
406
19-01-2022-23
Construction of Public Health Units(BPHUs) at Harirampur RH(C) Internal Electrification work.
Nihar Ghosh
16/12/2022
₹353,698.00
15/02/2023
193/ZP
24/02/2023
90
Days Left:-558
XV FC-Health Grants for FY-2021-22
407
13-05-20220-21
Drinking water providing wate ATM at Chourapara near Nripen Sarkar house, Vill - Chourapara, GP- Danga, under Balurghat PS
SMRITI CHANDRA KARMAKAR
30/12/2020
₹543,846.00
06/02/2021
317/Engg/ZP
02/08/2021
45
Days Left:-1174
15th FC Tied
408
02-04-2022-23
Construction of CC Road from Haridas Barman House towards Kamal Besra House in P.S. Tapan.
Somnath Kuiry
20/04/2022
₹1,942,308.00
29/09/2022
1000/ZP
06/01/2023
Scheme Completed: 03/03/2023
15th FC 2021-2022 Un-tied
409
09-10-2021-22
Construction of CC Road from Telikuri PMGSY Road via Milghar(1st Phase) under Ellahabad GP in P.S. Banshihari
Suhita Paul
08/02/2022
₹485,577.00
06/05/2022
408/ZP
30/06/2022
Scheme Completed: 28/03/2023
Repair/Maintenance of Rural Roads
410
03-07-2021-22
Construction of Covered Drain from Daulatpur Vim Roy House to Madan Laha’s House in P.S. Banshihari.
Suhita Paul
01/01/1970
₹606,971.00
12/03/2021
512/ZP
25/12/2021
Scheme Completed: 25/02/2023
15th FC Tied 20-21
411
22-01-2022-23
Internal Electrification Work at the RTE Production & Supply unit in Kamarpara Operated by Nabachetana Sangha Bahumukhi Samabay Samiti Ltd., Balurghat , Dakshin DInajpur.
Nihar Ghosh
09/09/2022
₹155,828.00
06/12/2022
1172/ZP
15/12/2022
Scheme Completed: 09/02/2023
RTE
412
23-15-2022-23
Construction of Public Samshan Ghat(Crematorium) beside Baul Khari in GP Bolla under Balurghat PS-47460841
PABAN BASAK
20/10/2022
₹990,196.00
16/01/2023
60/ZP
Not started
60
15th FC 2021-22 Un-Tied
413
23-14-2022-23
Internal Electrification Work of EVM Ware House(Three Storied) beside Minority Building at Balurghat District Collectorate Campus, Dakshin Dinajpur.
Nihar Ghosh
20/10/2022
₹990,439.00
16/01/2023
59/ZP
Not started
365
EVM/VVPAT Warehouses Fund
414
23-12-2022-23
Supply of Safe Drinking Water by Installation of Solar Based Overhead Water Tank near Biharipara Mandir, Vill-Fatepur, GP-Jalghar under Balurghat P.S.-44811317
PABAN BASAK
20/10/2022
₹971,153.00
16/01/2023
58/ZP
Not started
180
15th FC 2020-21 Tied
415
23-09-2022-23
INTERNAL ELECTRICAL WORKS FOR Block Public Health Unit (BPHU) at Kumarganj RH
Nihar Ghosh
20/10/2023
₹623,951.00
16/01/2023
57/ZP
Not started
365
416
23-08-2022-23
INTERNAL ELECTRICAL WORKS FOR Block Public Health Unit (BPHU) at Kushmandi RH
Nihar Ghosh
20/10/2022
₹623,951.00
16/01/2023
56/ZP
Not started
365
XV-FC HG During the Year 2022-2023
417
23-04-2022-23
Construction of covered drain from Douyakuri Village to Moktar House in P.S. Banshihari
Suhita Paul
20/10/2022
₹684,716.00
16/01/2023
55/ZP
20/02/2023
Scheme Completed: 11/05/2023
15th FC 2021-2022 -tied
418
23-03-2022-23
Construction of Covered Drain from Anup Sen House to Tower More under Boalder GP in P.S. Balurghat.
PABAN BASAK
20/10/2022
₹396,078.00
16/01/2023
54/ZP
23/01/2023
Scheme Completed: 15/03/2023
15th FC 2021-2022 -tied
419
23-02-2022-23
Installation of LED Street Light(High Mast Tower) at in front of Adarsha Academy Pransagar, Chaloon GP in P.S. Gangarampur, Dist- Dakshin Dinajpur.
Nihar Ghosh
20/10/2022
₹580,485.00
16/01/2023
53/ZP
02/02/2023
Scheme Completed: 27/03/2023
15th FC 2021-2022 Un-tied
420
23-01-2022-23
Installation of LED Solar Street Light(i) infront of Saprondighi Bazar, Basuria GP(ii) Panjul Hatkhola, Panjul GP (iii) in front of Maharajpur Bazar, Belbari-II GP(iv) Profulla Roy House Nadipar, Belbari –I GP
Nihar Ghosh
20/10/2022
₹349,607.00
16/01/2023
52/ZP
28/01/2023
Scheme Completed: 08/02/2023
15th FC 2021-2022 Un-tied
421
20-03-2022-23
CC road from Dipak Halder House towards Rahaman(Raman) Dighi Jalalpur under Belbari-II Gp in P.S. Gangarampur.-47439056
Kalyan Bose
30/08/2022
₹485,576.00
16/01/2023
61/ZP
27/03/2023
Scheme Completed: 12/06/2023
15th FC untied 21-22
422
23-05-2022-23
Internal Electrification work Northern Side of 2nd floor of DRDC building (District Traffic Office) under Dakshin Dinajpur Zilla Parishad in P.S. Balurghat, Dakshin Dinajpur(Electrical Work)
Nihar Ghosh
20/10/2022
₹187,624.00
11/01/2023
44/ZP
14/01/2023
Scheme Completed: 12/05/2023
Own
423
21-09-2022-23
Construction of Waiting Shed at Pandeyparea under Belbari-IGP in P.S. Gangarampur.-47460419
Kalyan Bose
30/08/2022
₹291,693.00
12/12/2022
1222/ZP
10/01/2023
Scheme Completed: 12/06/2023
15th FC Un-TIED 2021-22
424
21-06-2022-23
Construction of Covered Drain from Kader Miah House towards Osman Miah House, Sidlim under Chaloon GP in P.S. Gangarampur.-47400171
Kalyan Bose
30/08/2022
₹291,202.00
12/12/2022
1220/ZP
02/03/2023
Scheme Completed: 12/06/2023
15th FC TIED 2021-22
425
21-05-2022-23
Construction of Covered Drain from Najrul Islam Land towards Eidgha Mat, Jachi under Chaloon GP in P.S. Gangarampur.-47400077
Kalyan Bose
30/08/2022
₹291,202.00
12/12/2022
1219/ZP
25/01/2023
Scheme Completed: 12/06/2023
15th FC TIED 2021-22
426
20-07-2022-23
Construction of Covered Drain from Rama Majumder House to Bikash Chakraborty House at Dharanda Village of Hili GP in Hili Panchayat Samity-52228418
PABAN BASAK
30/08/2022
₹2,913,462.00
12/12/2022
1218/ZP
02/03/2023
120
Days Left:-522
15th FC TIED 2021-22
427
20-06-2022-23
Construction of Covered Drain from Juran Sarkar House to Uppal Ghode House under Mahabari GP in P.S. Banshihari.-47403074
Suhita Paul
30/08/2022
₹582,524.00
12/12/2022
1217/ZP
03/03/2023
Scheme Completed: 11/08/2023
15th FC TIED 2021-22
428
20-05-2022-23
Construction of Covered Drain from Samsia FP School School to Anisur Rahaman’s via Lutfar Rahaman’s House in P.S. Kushmandi-47401861
Suhita Paul
30/08/2022
₹2,913,462.00
12/12/2022
1216/ZP
Not started
120
15th FC TIED 2021-22
429
20-04-2022-23
Construction of Covered Drain from Muradpur village to Pucca Road under Mahabari GP in P.S. Banshihari.-47402168
Suhita Paul
30/08/2022
₹582,524.00
12/12/2022
1215/ZP
Not started
90
15th FC TIED 2021-22
430
20-02-2022-23
Construction of CC Road from Apan Roy towards Banu Miah Land under Jahangirpur GP in P.S. Gangarampur-47437966
Kalyan Bose
30/08/2022
₹485,569.00
12/12/2022
1214/ZP
22/01/2023
Scheme Completed: 12/06/2023
15th FC UN-TIED 2021-22
431
20-01-2022
Construction of CC Road from Anarul Miya House towards Abeskuri PMGSY road via Debnath Para, Belestholi under Basuria GP in P.S. Gangarampur-47406388
Kalyan Bose
30/08/2022
₹971,139.00
12/12/2022
1213/ZP
27/01/2023
Scheme Completed: 12/06/2023
15th FC UN-TIED 2021-22
432
19-13-2022-23
Construction of CC Road from Guljar Miya House to Ainal Miya House, Chalunda under Uday GP in P.S. Gangarampur-47406185
Kalyan Bose
24/08/2022
₹485,605.00
06/12/2022
1184/ZP
12/12/2022
90
Days Left:-632
15th FC UN-TIED 2021-22
433
19-11-2022-23
CC Road from Adibashipara Nirmal House towards Chotokum, Uttar Katatair under Sukdevpur GP in P.S. Gangarampur.-47406752
Kalyan Bose
24/08/2022
₹485,549.00
06/12/2022
1183/ZP
12/12/2022
90
Days Left:-632
15th FC UN-TIED 2021-22
434
19-10-2022-23
CC Road from Rahaman Ali House towards Hasan Ali House(land), Uttar Katatair under Sukdevpur GP in P.S. Gangarampur.-47406834
Kalyan Bose
24/08/2022
₹485,549.00
06/12/2022
1182/ZP
12/12/2022
90
Days Left:-632
15th FC UN-TIED 2021-22
435
19-09-2022-23
Construction of CC Road from PMGSY road to Srirampur(Fajilpur) Baro Masjit Club in P.S. Banshihari.-47447919
Suhita Paul
24/08/2022
₹1,165,369.00
06/12/2022
1181/ZP
04/01/2023
Scheme Completed: 25/03/2023
15th FC UN-TIED 2021-22
436
19-08-2022-23
CC Road repairing from Ashokgram Bazar towards Garoya House under Ashokgram GP in P.S. Gangarampur-47405988
Kalyan Bose
01/01/1970
₹485,575.00
06/12/2022
1180/ZP
12/12/2022
90
Days Left:-632
15th FC UN-TIED 2021-22
437
19-07-2022-23
Construction of CC Road from Binod Roy House towards Paikepara FP School in vill-Dasul under Nazirpur ZP in P.S. Balurghat.-47448678
PABAN BASAK
24/08/2022
₹1,188,235.00
06/12/2022
1179/ZP
10/03/2023
Scheme Completed: 10/05/2023
15th FC UN-TIED 2021-22
438
19-06-2022-23
Construction of CC Road from Purba Para Aptar Haripukur Sahin Mission to Rabiul House via Ataur Mondal House in P.S. Hili.-47443474
Somnath Kuiry
24/08/2022
₹776,923.00
06/12/2022
1178/ZP
Not started
90
15th FC UN-TIED 2021-22
439
19-05-2022-23
Construction of CC Road from Barampur Pur5ba Para to Moksed Ali via Dighi Para in P.S. Tapan.-47441544
Somnath Kuiry
24/08/2022
₹388,462.00
06/12/2022
1177/ZP
05/02/2023
Scheme Completed: 22/03/2023
15th FC UN-TIED 2021-22
440
19-04-2022-23
Construction of CC Road from Barampur FP School towards South Haritala in P.S. Tapan.-47441355
Somnath Kuiry
24/08/2022
₹388,462.00
06/12/2022
1176/ZP
05/02/2023
Scheme Completed: 23/03/2023
15th FC UN-TIED 2021-22
441
19-03-2022-23
Construction of CC Road from Patbanial towards Pacca Road in P.S. Tapan.-47442102
Somnath Kuiry
24/08/2022
₹1,165,385.00
06/12/2022
1175/ZP
07/02/2023
Scheme Completed: 10/05/2023
15th FC UN-TIED 2021-22
442
19-02-2022-23
Construction of CC Road from Abul Hossain House towards PMGSY road in P.S. Tapan.-47446085
Somnath Kuiry
24/08/2022
₹2,427,885.00
06/12/2022
1174/ZP
01/02/2023
Scheme Completed: 21/03/2023
15th FC UN-TIED 2021-22
443
19-01-2022-23
Construction of Cc Road from Sihol PWD Road to Mangal House via High School in P.S. Banshihari.-47447617
Suhita Paul
24/08/2022
₹1,165,265.00
06/12/2022
1173/ZP
27/01/2023
Scheme Completed: 17/03/2023
15th FC UN-TIED 2021-22
444
18-03-2022-23
Construction of EVM Ware house(Three Storied) behind SDO Gangarampur Office Building at Buniadpur, Dakshin Dinajpur, JL No-255, Plot No- 584, Mouza-Barail.
Kalyan Bose
18/08/2022
₹11,744,679.00
04/11/2022
1085/ZP
10/12/2022
360
Days Left:-364
EVM/ Election
445
17-08-2022-23
Repairing of Building (Ground Floor Repair and construction of rest part of roofat 1st floor) of Mahipal ZP Market Complex at Kushmandi.-44813810
Suhita Paul
17/08/2022
₹679,808.00
04/11/2022
1084/ZP
27/03/2023
Scheme Completed: 22/08/2023
15th FC Un-Tied 20-21
446
17-07-2022-23
Construction of Waiting Shed at Mahinipara Sashan under Belbari-I GP in P.S. Gangarampur.-44813849
Kalyan Bose
17/08/2022
₹291,693.00
04/11/2022
1083/ZP
10/01/2023
Scheme Completed: 12/06/2023
15th FC Un-Tied 20-21
447
17-06-2022
Construction of Waiting Shed at Nayabazar in P.S. Gangarampur- 44813859
PABAN BASAK
17/08/2022
₹291,693.00
04/11/2022
1082/ZP
11/02/2023
Scheme Completed: 02/09/2024
15th FC Un-Tied 20-21
448
17-04-2022-23
Construction of Community Toilet at beside MSK School, Vill-Jamalpur in P.S. Hili- 44811593
Somnath Kuiry
17/08/2022
₹971,154.00
04/11/2022
1081/ZP
Not started
180
15th FC Tied 20-21
449
17-03-2022-23
Supply of Safe Drinking Water by Providing Water ATM at Kharail Bazar, Vill-Kharail GP-Deor under Kumarganj PS.-44807447
PABAN BASAK
17/08/2022
₹543,846.00
04/11/2022
1080/ZP
Not started
180
15th FC Tied 20-21
450
17-02-2022-23
Supply of Safe Drinking Water by Providing Water ATM at front side of Chandganj Library, Vill-Chandganj GP-Safanagar under Kumarganj PS.-44811165
PABAN BASAK
17/08/2022
₹543,846.00
04/11/2022
1079/ZP
Not started
180
15th FC Tied 20-21