151 |
20-04-23-24 |
Installation of Mini Mast with LED Solar Street light at Panjipara in P.S.-Banshihari ,G.P.-Chaloon, Dist-Dakshin Dinajpur-57850735 |
|
Nihar Ghosh |
12/05/2023 |
₹505,168.00 |
19/07/2023 |
1115/ZP |
Not started |
60
|
15th FC –UN-TIED (22-23) |
|
152 |
20-03-23-24 |
Construction of Covered Drain from Kalam Choudhury House to Rail Gate in P.S. Banshihari. |
|
Suhita Paul |
12/05/2023 |
₹485,577.00 |
19/05/2023 |
1114/ZP |
21/07/2023 |
Scheme Completed: 05/12/2023 |
15th FC TIED (22-23) |
|
153 |
20-02-23-24 |
Construction of Cover Drain from Belpukur Mission to Jaharpur Khari in Vill-Belbari under Elahabad GP in P.S. Banshihari-58352519 |
|
Suhita Paul |
12/05/2023 |
₹495,098.00 |
19/05/2023 |
1113/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
154 |
20-01-23-24 |
Construction of Cover Drain at Nandapukur 9n Vill-Nandapukur under Akcha GP in P.S. Kushmandi-58360894 |
|
Suhita Paul |
12/05/2023 |
₹742,646.00 |
19/07/2023 |
1112/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
155 |
18-01-23-24 |
Construction of Community Toilet at Purba Bishnapur Ashokgram in P.S. Gangarampur.-47394053 |
|
PABAN BASAK |
03/05/2023 |
₹541,881.00 |
29/05/2023 |
960/ZP |
Not started |
90
|
15th FC TIED (21-22) |
|
156 |
16-19-23-24 |
Installation of solar street light in Gangarampur Municipality Area different ward (Total No-32) |
|
Nihar Ghosh |
03/05/2023 |
₹804,714.00 |
29/05/2023 |
959/ZP |
Not started |
60
|
BEUP 41 |
|
157 |
16-18-23-24 |
Repairing of Metal Road from NH-512 towards Ratanmala Colony in P.S.Gangarampur, |
|
Kalyan Bose |
03/05/2023 |
₹895,159.00 |
29/05/2023 |
958/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
158 |
16-17-23-24 |
Construction of CC Road from Front of Haridas House towards Battala Sub-Center at Maligaon GP in P.S. Kushmandi.-57585818 |
|
Suhita Paul |
03/05/2023 |
₹776,616.00 |
29/05/2023 |
957/ZP |
Not started |
60
|
15th FC UN-TIED (22-23) |
|
159 |
16-16-23-24 |
lnstallation of Solar Based overhead Reservoir at front side of Piter Barur House vill- (uaran, chakvrigu under Balurghat PS.- 47388117 |
|
Nihar Ghosh |
03/05/2023 |
₹990,195.00 |
29/05/2023 |
956/ZP |
Not started |
60
|
15th FC TIED (21-22) |
|
160 |
16-13-23-24 |
Construction of Building of Bisramagar near Tapser Miah House village of Dwipkhanda under Dwipkhanda GP in PS Tapan-57805730 |
|
Nihar Ghosh |
03/05/2023 |
₹296,950.00 |
29/05/2023 |
955/ZP |
Not started |
60
|
15th FC UN-TIED (2022-23) |
|
161 |
16-11-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Taslima Khatun at mouja-Velakuri ,Udaypur G.P. under Kushmandi Block-66444508 |
|
Nihar Ghosh |
03/05/2023 |
₹770,406.00 |
29/05/2023 |
954/ZP |
08/09/2023 |
60
Days Left:-380
|
15th FC TIED (2022-23) |
|
162 |
16-07-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Haider Ali at mouja-Kanjhara ,Elahabad G.P. under Banshihari Block-66444106 |
|
Nihar Ghosh |
03/05/2023 |
₹770,406.00 |
29/05/2023 |
953/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
163 |
16-05-23-24 |
INSTALATION OF SOLAR BASED PUMP HOUSE FOR MINOR IRRIGATION AT JAGADISHPUR Mafijuddin Sarkar (Dungu) LAND at mouja-Jagadispur ,Uday G.P. under Gangarampur Block-66444018 |
|
Nihar Ghosh |
03/05/2023 |
₹770,406.00 |
29/05/2023 |
952/ZP |
29/07/2023 |
60
Days Left:-421
|
15th FC TIED (2022-23) |
|
164 |
16-02-23-24 |
Supply and Installation of LED Solar Street Light at (i) Jordighi Sashan, Banshihari Block (ii) Kundana Chowrangee More and Banke Bihari Temple, Harirampur Block. |
|
Nihar Ghosh |
03/05/2023 |
₹552,504.00 |
29/05/2023 |
951/ZP |
Not started |
45
|
BEUP |
|
165 |
14-01-23-24 |
Construction of Boundary Wall at Saraswati Sishu Vidya Mandir, Vill- Badbangi(Kharil), Balurghat Block. |
|
PABAN BASAK |
27/04/2023 |
₹4,855,770.00 |
29/05/2023 |
949/ZP |
Not started |
90
|
MPLAD |
|
166 |
14-05-23-24 |
Repair Maintenance of Road from Laxmitala to Anantapur under Akcha GP in P.S. in P.S. Kushmandi. |
|
Suhita Paul |
27/04/2023 |
₹1,943,579.00 |
29/05/2023 |
950/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
167 |
13-04-23-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Sankar Sarkar at Gochihar at Jotmaljkha Mouza, Damdama GP under Gangarampur Block.-66435511 |
|
Nihar Ghosh |
24/04/2023 |
₹770,406.00 |
29/05/2023 |
948/ZP |
Not started |
60
|
15th FC TIED (2022-23) |
|
168 |
13-03-23-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Swarup Sarkar Chakmadhusudan Mouza, Ramchandrapur GP under Tapan Block.-66422451 |
|
Nihar Ghosh |
24/04/2023 |
₹770,406.00 |
29/05/2023 |
947/zp |
21/07/2023 |
60
Days Left:-429
|
15th FC TIED (2022-23) |
|
169 |
13-02-23-24 |
Installation of Water Purified System at Harirampur Hospital, Vill-Harirampur, GP-harirampur under Harirampur PS-56430693 |
|
Kalyan Bose |
24/04/2023 |
₹543,846.00 |
29/05/2023 |
946/zp |
Not started |
90
|
15th FC 2020-21 Savings |
|
170 |
12-03-23-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Anichur Rahaman Mia at Chatma mouza,Deor G.P. under Kumarganj Block-66437264 |
|
Nihar Ghosh |
24/04/2023 |
₹770,406.00 |
29/05/2023 |
945/ZP |
21/07/2023 |
Scheme Completed: 11/12/2023 |
15th FC TIED (22-23) |
|
171 |
11-11-23-24 |
Construction of Public Health unit (BPHU) under XV-FC HG during the year 2023-24(Internal Electrification work) at Chaloon BPHC in Gangarampur PS |
|
Nihar Ghosh |
20/04/2023 |
₹697,566.00 |
29/05/2023 |
944/ZP |
Not started |
90
|
15th FC Health Grant(23-24) |
|
172 |
11-09-23-24 |
Construction of Building less under XV-FC HG during the year 2023-24(Internal Electrification work) at Kurumsur SC in P.S.Gangarampur |
|
Nihar Ghosh |
20/04/2023 |
₹422,180.00 |
29/05/2023 |
943/ZP |
Not started |
60
|
15th FC Health Grant(23-24) |
|
173 |
11-07-23-24 |
Construction of CC Road from House of Bhabesh Das towards Chintaranjan Club under Ramchandrapur GP In P.S. Tapan.-57728428 |
|
Somnath Kuiry |
20/04/2023 |
₹593,332.00 |
29/05/2023 |
942/ZP |
Not started |
60
|
15th FC UN-TIED (22-23) |
|
174 |
11-05-23-24 |
Construction of CC Road from Dakshin Kesrail Bot gach to Parbotpur under Gofanagar GP in P.S. Tapan.-57719730 |
|
Somnath Kuiry |
20/04/2023 |
₹971,154.00 |
29/05/2023 |
941/ZP |
18/08/2023 |
Scheme Completed: 04/11/2023 |
15th FC UN-TIED (22-23) |
|
175 |
11-04-23-24 |
Construction of covered Drain from Jaimuddin Sarkar House to Naimiddin House at Sankar under Gofanagar GP in P.S. Tapan.-58335908 |
|
Somnath Kuiry |
20/04/2023 |
₹485,577.00 |
29/05/2023 |
940/ZP |
Not started |
60
|
15th FC UN-TIED (22-23) |
|
176 |
11-03-23-24 |
Construction of Community Toilet at front side of Daral Hat Masjit under Dwipkhanda GP in P.S. Tapan.-58573097(Electrical Work) |
|
Somnath Kuiry |
20/04/2023 |
₹95,497.00 |
29/05/2023 |
939/ZP |
Not started |
60
|
15th FC TIED (22-23 |
|
177 |
11-02-23-24 |
Construction of Community Toilet at front side of Daral Hat Masjit under Dwipkhanda GP in P.S. Tapan.-58573097(Civil Work) |
|
Somnath Kuiry |
20/04/2023 |
₹875,656.00 |
29/05/2023 |
938/ZP |
Not started |
60
|
15th FC TIED (22-23) |
|
178 |
11-01-23-24 |
Construction of Community Toilet(Internal Electrification) front side of Kamalpur FP School, Vill-Kamalpur in Hazratpur GP in P.S. Tapan.-44811577 |
|
Somnath Kuiry |
20/04/2023 |
₹84,595.00 |
29/05/2023 |
937/ZP |
Not started |
60
|
15th FC TIED (20-21) |
|
179 |
24-01-22-23 |
Repair & maintenance of wooden foot bridge at Bijli Ghat (over river Brahmani) under Belbari - I GP in PS - Gangarampur |
|
Kalyan Bose |
22/11/2022 |
₹270,590.00 |
15/02/2023 |
207/ZP |
12/03/2023 |
60
Days Left:-560
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
180 |
26-08-22-23 |
Repair and Maintenance of Wooden Foot Bridge with approach road at Uttar Belbari near Jr. Basic School(over Brahmani) under Belbari-I GP in P.S. Gangarampur. |
|
Kalyan Bose |
08/12/2022 |
₹600,400.00 |
10/02/2023 |
175/ZP |
02/06/2023 |
Scheme Completed: 31/08/2023 |
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
181 |
10-04-23-24 |
Construction of Building-Less Sub-Centers(SCs) at Kurumsur SC under Gangarampur PS |
|
PABAN BASAK |
20/04/2023 |
₹4,255,756.00 |
24/05/2023 |
907/ZP |
Not started |
356
|
XV FC Health Grant (2023-24) |
|
182 |
10-03-23-24 |
Construction of Building-Less Sub-Centers(SCs) at Nilahari SC under Gangarampur PS |
|
PABAN BASAK |
20/04/2023 |
₹4,255,756.00 |
24/05/2023 |
906/ZP |
Not started |
356
|
XV FC Health Grant (2023-24) |
|
183 |
10-01-23-24 |
Construction of Block Public Health Unit(BHPU) at Chaloon BPHC under Gangarampur PS. |
|
Kalyan Bose |
20/04/2023 |
₹5,648,486.00 |
24/05/2023 |
905/ZP |
Not started |
365
|
XV FC Health Grant (2023-24) |
|
184 |
02-12-23-24 |
Installation of LED Street Light(Solar High Mast) at Kumarganj Police Station at Safanagar GP in P.S. Kumarganj, Dist- Dakshin Dinajpur. 66244663 |
|
Nihar Ghosh |
05/04/2023 |
₹506,942.00 |
08/05/2023 |
750/ZP |
30/06/2023 |
Scheme Completed: 05/09/2023 |
15th FC Un-TIED-2020-21(supplementary) |
|
185 |
38-05-22-23 |
Construction of CC Road from Front Side of Bes-an-Noor Model School(Girls) at Haripur of Ellahabad GP in P.S. Banshihari.- 57591991 |
|
Suhita Paul |
19/01/2023 |
₹582,692.00 |
04/12/2023 |
|
03/05/2023 |
Scheme Completed: 06/07/2023 |
15th FC UN-TIED (22-23) |
|
186 |
05-04-2022-23 |
Construction of covered drain from krishnapur Ratin saha house to Chunu Hambrom house in P.S. Banshihari |
|
Suhita Paul |
20/04/2022 |
₹585,802.00 |
21/11/2022 |
1128/ZP |
10/04/2023 |
Scheme Completed: 26/06/2023 |
15th FC 21-22 Tied |
|
187 |
38-01-22-23 |
Construction of CC Road from Kajaltali road towards Haritali Ghat under Basuria GP in P.S. Gangarampur.-57720455 |
|
PABAN BASAK |
19/01/2023 |
₹971,153.00 |
13/04/2023 |
597/ZP |
18/04/2023 |
45
Days Left:-538
|
15th FC UN-TIED (22-23) |
|
188 |
01-10-2022-23 |
Construction of Covered Drain from Mobarakpur Tetultala to Chhiramati river (Syedpur) in PS Harirampur |
|
Kalyan Bose |
20/04/2022 |
₹582,466.00 |
10/01/2023 |
38/ZP |
02/02/2023 |
60
Days Left:-598
|
15th FC 2020-21 Savings |
|
189 |
38-11-22-23 |
Construction of CC Road from Gochiar Buripukur Gupin Barman House to Sadananda House under Damdama GP in P.S. Gangarampur.-66246489 |
|
Kalyan Bose |
19/01/2023 |
₹388,462.00 |
23/03/2023 |
421/ZP |
28/03/2023 |
45
Days Left:-559
|
15th FC(Savings) 2020-21 |
|
190 |
9-03-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Sankar Barman at mouja-Ratanmala ,Damdama G.P. under Gangarampur Block-66444697 |
|
Nihar Ghosh |
19/04/2023 |
₹770,406.00 |
24/05/2023 |
899/ZP |
06/08/2023 |
60
Days Left:-413
|
15th FC TIED (2022-23) |
|
191 |
9-01-23-24 |
Instalation of solar based pump House for Minor Irrigation land of Motibur Molla Mouza-Aktal, Tapan Chandipur GP under Tapan Block.-66443770 |
|
Nihar Ghosh |
19/04/2023 |
₹770,406.00 |
24/05/2023 |
898/ZP |
02/08/2023 |
60
Days Left:-417
|
15th FC TIED (2022-23) |
|
192 |
8-07-23-24 |
Construction of CC Road from Badalpur Bridge to East Side Sajanpur in vill-Badalpur under Bolla GP in P.S. Balurghat.-57726437 |
|
PABAN BASAK |
19/04/2023 |
₹1,485,294.00 |
24/05/2023 |
897/ZP |
18/08/2023 |
90
Days Left:-371
|
15th FC UN-TIED (2022-23) |
|
193 |
8-06-23-24 |
Construction of CC Road from Simanta Elaka Molla Para to Dudkuri in vill-Mollapara under GP Bhatpara in P.S. Balurghat.-57730192 |
|
PABAN BASAK |
19/04/2023 |
₹1,584,313.00 |
23/05/2023 |
887/ZP |
Not started |
90
|
15th FC UN-TIED (22-23) |
|
194 |
8-05-23-24 |
Repair and Maintenance CC Road from Ashutosh Sarkar House towards Rahamat Ali via Wajuddin House at Sukdevpur in P.S. Gangarampur. |
|
PABAN BASAK |
19/04/2023 |
₹2,099,477.00 |
23/05/2023 |
886/ZP |
05/08/2023 |
90
Days Left:-384
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
195 |
8-04-2023 |
Repair and Maintenance CC Road from Gachihar Manthara towards Damina FP School in P.S. Gangarampur. |
|
PABAN BASAK |
19/04/2023 |
₹1,825,277.00 |
23/05/2023 |
885/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
196 |
8-02-23-24 |
Repair and Maintenance of Road from Kalitala to Rail Bridge via Kadighat in Belbari-I GP under Gangarampur PS. |
|
Kalyan Bose |
19/04/2324 |
₹3,694,622.00 |
23/05/2023 |
884/ZP |
14/07/2023 |
90
Days Left:-406
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
197 |
8-01-23-24 |
Repairing and Maintenance of Road from Tangapara to Jalalpur in Belbari-II GP under PS Gangarampur. |
|
Kalyan Bose |
19/04/2023 |
₹4,870,320.00 |
23/05/2023 |
883/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
198 |
7-15-23-24 |
Repairing of HiBh Mast & Minimast(Eledrical) Light in Bolla Mandir-Maligaon GP, Mahipal Bazar[1]Udaypur GP, Panishala Hat-Karanj GP, Kushmandi Chowrangi-Kushmandi GP, under Kushmandi BIocL Batun Bustand Kumarganj Block, Maharajpur Bus Stand Gangarampur Block.- 66878555 |
|
Nihar Ghosh |
18/04/2023 |
₹578,932.00 |
23/05/2023 |
882/ZP |
08/06/2023 |
60
Days Left:-472
|
15th FC Un-Tied Supplementary (20-21) |
|
199 |
7-12-23-24 |
Supply .and Installation of LED Sloar Street Light at Patiram, Uttat Raipur near Kasem Choudhury, Rampur Suhari near Samiruddin Sarkar and Fulbari ,Shibpur Block- Gangarampur, Tapan, Balurghat GP-Uday Patiram, Harsura Dist- Dakshin Dinajpur. |
|
Nihar Ghosh |
18/04/2023 |
₹506,462.00 |
23/05/2023 |
881/ZP |
30/05/2023 |
Scheme Completed: 24/07/2023 |
15th FC UN-TIED (22-23) |
|
200 |
7-11-23-24 |
Outdoor Electrification Work and Construction of AC Room of Sukanta Bhavan at Buniadpur, Dakshin Dinajpur. |
|
Nihar Ghosh |
18/04/2023 |
₹827,818.00 |
23/05/2023 |
880/ZP |
17/07/2023 |
Scheme Completed: 17/08/2023 |
NBDD |
|
201 |
7-10-23-24 |
Installation of LED Solar High Mast at BSP Club More in P.S. Gangarampur, GP-Belbari-I, Dakshin Dinajpur-68298813 |
|
Nihar Ghosh |
18/04/2023 |
₹506,897.00 |
23/05/2023 |
879/ZP |
01/06/2023 |
Scheme Completed: 06/08/2023 |
15th FC TIED (20-21) Supplementary |
|
202 |
7-09-23-24 |
Supply of Drinking Water by Providing Submersible Pump at Kaldighi Bat-tala near Mandir under Gangarampur PS-68298183 |
|
Kalyan Bose |
18/04/2023 |
₹194,901.00 |
23/05/2023 |
878/ZP |
Not started |
60
|
15th FC TIED (20-21) Supplementary |
|
203 |
7-08-23-24 |
Construction of Covered Drain from Selim Ahamed(blusoom school) towards PWD road, Jahangirpur in P.S. Gangarampur-58332964 |
|
PABAN BASAK |
18/04/2023 |
₹776,679.00 |
23/05/2023 |
877/ZP |
Not started |
90
|
15th FC TIED (22-23) |
|
204 |
7-07-23-24 |
Construction of CC Road from Fulbari Bus-Stand to Market road (internal) under Uday GP in P.S. Gangarampur-66878895 |
|
PABAN BASAK |
18/04/2023 |
₹874,039.00 |
23/05/2023 |
876/ZP |
20/07/2023 |
60
Days Left:-430
|
15th FC TIED(Supplementary -21-22) |
|
205 |
7-05-23-24 |
CC road from Kishori Roy House end towards Harish Roy House at Singforka under Sukdevpur GP in P.S. Gangarampur.-57575696 |
|
PABAN BASAK |
18/04/2023 |
₹485,423.00 |
23/05/2023 |
875/ZP |
Not started |
60
|
15th FC UN-TIED (2022-23) |
|
206 |
7-04-23-24 |
CC Road from Manasa Mandal More end towards Pathan Para FP School under Sukdevpur GP in P.S. Gangarampur.-57731586 |
|
PABAN BASAK |
18/04/2023 |
₹970,919.00 |
23/05/2023 |
874/ZP |
05/08/2023 |
60
Days Left:-414
|
15th FC UN-TIED (2022-23) |
|
207 |
7-03-23-24 |
Repair and maintenance of Road from BSP Club More to Protap Adhikari House in Belbari-I GP under Gangarampur PS. |
|
Kalyan Bose |
18/04/2023 |
₹478,048.00 |
23/05/2023 |
873/ZP |
22/09/2023 |
60
Days Left:-366
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
208 |
7-02-23-24 |
Repairing and Maintenance of Road from Pagol Sutradhar House to SSK School in Belbari-II GP under Gangarampur PS |
|
Kalyan Bose |
18/04/2023 |
₹794,541.00 |
23/05/2023 |
872/ZP |
29/05/2023 |
60
Days Left:-482
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
209 |
7-01-23-24 |
Repairing and Maintenance of Road from Bhatra Durgamandap to Danihar Village in Boalder GP under Balurghat PS. |
|
PABAN BASAK |
18/04/2023 |
₹537,586.00 |
23/05/2023 |
871/ZP |
Not started |
60
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
210 |
4-16-23-24 |
Installation of Mini Mast with LED Solar Street Light at Shibpur Madrasha(Bagdhara more) in P.S. Gangarampur, GP-Uday, Dist-Dakshin Dinajpur. |
|
Nihar Ghosh |
01/01/1970 |
₹506,896.00 |
11/05/2023 |
787/ZP |
25/07/2023 |
Scheme Completed: 06/10/2023 |
15th FC UN TIED (2022-23) |
|
211 |
4-15-23-24 |
Supply and Installation of LED Solar Street Light at Tapan School More Vill-Kasba in P.S. Tapan, Gp-Chandipur, Dist- Dakshin Dinajpur.-58041173 |
|
Nihar Ghosh |
10/04/2023 |
₹414,378.00 |
11/05/2023 |
786/ZP |
31/05/2023 |
Scheme Completed: 05/08/2023 |
15th FC UN TIED (2022-23) |
|
212 |
14-23-24 |
Supply and Installation of LED Solar Street Light at Math Pukur, Nakair Sova Miah House and near Masjit, Malancha Swasan Ghat and near Gobinda Pramanik house, Kamalpur Soleman Mondal House, Tasimot Sarkar House and Kamalpur FP School in P.S. Gangarampur & Tapan, GP-Uday & Hazrathpur, Dist- Dakshin Dinajpur.-58027118 |
|
Nihar Ghosh |
10/04/2023 |
₹414,378.00 |
11/05/2023 |
910/ZP |
30/05/2023 |
Scheme Completed: 25/07/2023 |
15th FC UN TIED (2022-23) |
|
213 |
09-23-24 |
Supply and Installation of LED Solar Street Light at Belbari-II GP Area different places in P.S.-Gangarampur, GP-Belbari, Dist- Dakshin Dinajpur-58046427 |
|
Nihar Ghosh |
10/04/2023 |
₹184,168.00 |
11/05/2023 |
784/ZP |
Not started |
60
|
15th FC UN TIED (2022-23) |
|
214 |
4-08-23-24 |
Supply and Installation of LED Solar Street Light at Sidlim Adibashi Para(Girja Ghar) in P.S.-Gangarampur, GP-Chaloon, Dist- Dakshin Dinajpur.-57853856 |
|
Nihar Ghosh |
10/04/2023 |
₹506,462.00 |
11/05/2023 |
783/ZP |
Not started |
60
|
15th FC UN TIED (2022-23) |
|
215 |
4-07-23-24 |
Supply and Installation of LED Solar Street Light at Front Side of Deor High School in P.S. Kumarganj, GP-Deor, Dist- Dakshin Dinajpur.-57912118 |
|
Nihar Ghosh |
10/04/2023 |
₹506,462.00 |
11/05/2023 |
782/ZP |
07/06/2023 |
Scheme Completed: 05/08/2023 |
15th FC UN TIED (2022-23) |
|
216 |
4-06-23-24 |
Supply and Installation of LED Solar Street Light at Front Side of Satipukur Hat in P.S. Kumarganj, GP-Deor, Dist- Dakshin Dinajpur.-57913140 |
|
Nihar Ghosh |
10/04/2023 |
₹506,462.00 |
11/05/2023 |
781/ZP |
07/06/2023 |
Scheme Completed: 05/08/2023 |
15th FC UN TIED (2022-23) |
|
217 |
4-03-2023-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Bhupendranath Barman and Nabin Ch. Barman at Bolla Mouza, Bolla GP under Balurghat Block.-66436149 |
|
Nihar Ghosh |
10/04/2023 |
₹770,406.00 |
11/05/2023 |
780/ZP |
07/06/2023 |
60
Days Left:-473
|
15th FC UN TIED (2022-23) |
|
218 |
38-08-2022-23 |
Construction of CC Road from Sial Para Pakka Road to River Side new Mandir in P.S. Kumarganj-57579984 |
|
Somnath Kuiry |
19/01/2023 |
₹971,154.00 |
13/04/2023 |
596/ZP |
21/04/2023 |
Scheme Completed: 29/05/2023 |
15th FC UN-TIED (22-23) |
|
219 |
6-2-2023-24 |
Construction of BT Road from Muripukur(PMGY) to House of Makbul Tappo via House of Suka Master vill of Bandighi under Harsura GP in P.S. Tapan. L- 0.89 KM |
|
Somnath Kuiry |
28/04/2023 |
₹2,733,311.00 |
19/05/2023 |
850/ZP |
Not started |
60
|
RASTA SHREE 2023 |
|
220 |
6-1-2023-24 |
Construction of Metal Road from Ekhahar PMG to Nailakuri SSK under Uday GP in P.S. Gangarampur. L- 0.96 KM |
|
Kalyan Bose |
28/04/2023 |
₹3,659,258.00 |
19/05/2023 |
849/ZP |
Not started |
60
|
RASTA SHREE 2023 |
|
221 |
32-09-2022-23 |
Supply of Drinking Water by Providing Submersible Pump at Mohini Para Sashan Ghat, Dakshin Joypur under Belbari-I GP in P.S. Gangarampur.- 47392775 |
|
PABAN BASAK |
21/12/2022 |
₹182,936.00 |
15/02/2023 |
197/ZP |
23/04/2023 |
60
Days Left:-518
|
15th FC TIED 20-21 |
|
222 |
32-08-2022-23 |
Supply of Drinking Water by Providing Submersible Pump at Pandey Para Sashan Ghat, Dakshin Joypur under Belbari-I GP in P.S. Gangarampur.- 47392200 |
|
PABAN BASAK |
21/12/2022 |
₹182,936.00 |
15/02/2023 |
196/ZP |
23/04/2023 |
60
Days Left:-518
|
15th FC TIED (20-21) |
|
223 |
32-04-2022-3 |
Construction of Cc Road from Gamibari to Kuraldanga More under Mohana GP in P.S. Kumarganj.- 47445015 |
|
Somnath Kuiry |
21/12/2023 |
₹1,366,470.00 |
15/02/2023 |
195/ZP |
02/03/2023 |
Scheme Completed: 25/05/2023 |
15th FC UN TIED 21-22 |
|
224 |
03-23-2023-24 |
Repair and Maintenance of Hume Pipe at Joardar Para under Jahangirpur GP in P.S. Gangarampur. |
|
Kalyan Bose |
06/04/2023 |
₹990,470.00 |
10/05/2023 |
771/ZP |
Not started |
60
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
225 |
03-22-2023-24 |
Construction of CC Road from Bilondo Bati School More to Karbula High Madrasha - 57584697 |
|
Suhita Paul |
06/04/2023 |
₹971,154.00 |
10/05/2023 |
770/ZP |
Not started |
60
|
15th FC UN-TIED (22-23) |
|
226 |
03-21-2023-24 |
Construction of CC Road from Somnath Baske House towards Biswajit Murmu House under Pundari GP in P.S. Harirampur.-57835930 |
|
Kalyan Bose |
06/04/2023 |
₹582,523.00 |
10/05/2023 |
769/ZP |
15/05/2023 |
60
Days Left:-496
|
15th FC UN-TIED (22-23) |
|
227 |
03-20-2023-24 |
Construction of CC road from Fajlu Rahaman House towards Baso Hembrom house under Pundari GP in P.S. Harirampur-57835039 |
|
Kalyan Bose |
06/04/2023 |
₹679,808.00 |
10/05/2023 |
768/ZP |
15/05/2023 |
60
Days Left:-496
|
15th FC UN-TIED (22-23) |
|
228 |
03-19-2023-24 |
Construction of Cc Road from House of Shymal Pahan towards House of Budhhaded Sahain vill-Hatisala under Danga GP in P.S. Balurghat-57730514 |
|
PABAN BASAK |
06/04/2023 |
₹682,332.00 |
10/05/2023 |
767/ZP |
31/05/2023 |
60
Days Left:-480
|
15th FC UN-TIED (22-23) |
|
229 |
03-18-2023-24 |
Instalation of solar based pump House for Minor Irrigation land of Babi Miah at mouja-Badsankar, Hasnagar G.P. under Tapan Block-66447178 |
|
Nihar Ghosh |
06/04/2023 |
₹770,406.00 |
10/05/2023 |
766/ZP |
20/07/2023 |
60
Days Left:-430
|
15th FC -TIED (22-23) |
|
230 |
03-17-2023-24 |
Instalation of solar based pump House for Minor Irrigation land of Mariam Hembrom at mouja-Hasaipur, Gofanagar G.P. under Tapan Block-66447120 |
|
Nihar Ghosh |
06/04/2023 |
₹770,406.00 |
10/05/2023 |
765/ZP |
31/05/2023 |
60
Days Left:-480
|
15th FC -TIED (22-23) |
|
231 |
3-15-2023-24 |
Instalation of solar based pump House for Minor Irrigation land of Nurul Islam Mandal at mouja-Deor ,Deor G.P. under Kumarganj Block-664457 |
|
Nihar Ghosh |
06/04/2023 |
₹770,406.00 |
10/05/2023 |
764/ZP |
21/07/2023 |
Scheme Completed: 11/12/2023 |
15 FC 22-23 Tied |
|
232 |
03-10-203-24 |
Instalation of solar based pump House for Minor Irrigation land of Bivas Ratan Chatterjee at mouja-Koigram ,Najirpur G.P. under Balurghat Block-66444544 |
|
Nihar Ghosh |
06/04/2023 |
₹770,406.00 |
10/05/2023 |
763/ZP |
Not started |
60
|
15th FC -TIED (22-23) |
|
233 |
04-16-2023-24 |
Installation of Mini Mast with LED Solar Street Light at Shibpur Madrasha(Bagdhara more) in P.S. Gangarampur, GP-Uday, Dist-Dakshin Dinajpur. |
|
Nihar Ghosh |
10/04/2023 |
₹506,896.00 |
11/05/2023 |
787/ZP |
Not started |
60
|
15th FC UN-TIED (22-23) |
|
234 |
04-15-2023-24 |
Supply and Installation of LED Solar Street Light at Tapan School More Vill-Kasba in P.S. Tapan, Gp-Chandipur, Dist- Dakshin Dinajpur.-58041173 |
|
Nihar Ghosh |
10/04/2023 |
₹414,378.00 |
11/05/2023 |
786/ZP |
Not started |
60
|
15th FC UN-TIED (22-23) |
|
235 |
04-09-2023-24 |
Supply and Installation of LED Solar Street Light at Belbari-II GP Area different places in P.S.-Gangarampur, GP-Belbari, Dist- Dakshin Dinajpur-58046427 |
|
Nihar Ghosh |
10/04/2023 |
₹184,168.00 |
11/05/2023 |
784/ZP |
24/05/2023 |
Scheme Completed: 07/06/2023 |
15th FC UN-TIED (22-23) |
|
236 |
04-08-2023-24 |
Supply and Installation of LED Solar Street Light at Sidlim Adibashi Para(Girja Ghar) in P.S.-Gangarampur, GP-Chaloon, Dist- Dakshin Dinajpur.-57853856 |
|
Nihar Ghosh |
10/04/2023 |
₹506,462.00 |
11/05/2023 |
783/ZP |
24/05/2023 |
Scheme Completed: 19/06/2023 |
15th FC UN-TIED (22-23) |
|
237 |
04-07-2023-24 |
Supply and Installation of LED Solar Street Light at Front Side of Deor High School in P.S. Kumarganj, GP-Deor, Dist- Dakshin Dinajpur.-57912118 |
|
Nihar Ghosh |
10/04/2023 |
₹506,462.00 |
11/05/2023 |
782/ZP |
Not started |
60
|
15th FC UN-TIED (22-23) |
|
238 |
04-06-2023-24 |
Supply and Installation of LED Solar Street Light at Front Side of Satipukur Hat in P.S. Kumarganj, GP-Deor, Dist- Dakshin Dinajpur.-57913140 |
|
Nihar Ghosh |
10/04/2023 |
₹506,462.00 |
11/05/2023 |
781/ZP |
Not started |
60
|
15th FC UN-TIED (22-23) |
|
239 |
04-03-2023-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Bhupendranath Barman and Nabin Ch. Barman at Bolla Mouza, Bolla GP under Balurghat Block.-66436149 |
|
Nihar Ghosh |
10/04/2023 |
₹770,406.00 |
11/05/2023 |
780/ZP |
Not started |
60
|
15 FC 22-23 Tied |
|
240 |
34-01/2022-23 |
e-Cart Garbage Collector Vehicle |
|
Nihar Ghosh |
05/01/2023 |
₹0.00 |
03/03/2023 |
287/ZP |
07/03/2023 |
Scheme Completed: 19/05/2023 |
15th FC Tied 20-21 |
|
241 |
63-09-2022-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Khakan Roy at Belbari mouza,Belbari -I G.P. under Gangarampur Block-66437322 |
|
Nihar Ghosh |
28/03/2023 |
₹770,406.00 |
10/05/2023 |
762/ZP |
19/09/2023 |
60
Days Left:-369
|
15th FC TIED (2022-23) |
|
242 |
63-07-2022-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Subrata Roy at Uttar Belbari Mouza, Bgelbari-I GP under Gangarampur Block.-66435353 |
|
Nihar Ghosh |
28/03/2023 |
₹770,406.00 |
10/05/2023 |
761/ZP |
01/09/2023 |
60
Days Left:-387
|
15th FC TIED (2022-23) |
|
243 |
62-12-2022-23 |
Construction of Community Toilet & drinking water facility at Child Development Center at Udaan Campus in P.S. Gangarampur.-47394526 |
|
Kalyan Bose |
16/03/2023 |
₹970,862.00 |
04/05/2023 |
732/ZP |
15/05/2023 |
90
Days Left:-466
|
15th FC TIED (21-22) |
|
244 |
62-11-2022-23 |
Excavation of Earthen Drain at the premises of Balurghat Ait Port under No-6 Danga GP in P.S. Balurghat-66878245 |
|
PABAN BASAK |
24/03/2023 |
₹460,553.00 |
04/05/2023 |
731/ZP |
18/05/2023 |
90
Days Left:-463
|
15th FC TIED (21-22) (supplementary) |
|
245 |
62-8-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at front side of Dipkhanda FP School, Vill-Dipkhanda under Tapan PS.-47381184 |
|
Somnath Kuiry |
24/03/2023 |
₹534,134.00 |
04/05/2023 |
730/ZP |
Not started |
|
15th FC TIED (21-22) |
|
246 |
62-06-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at front side of Mahindar Gangarampur Bazar(Hamidur Rahaman near shop), Vill- Ajmatpur under Tapan PS.-47384319 |
|
Somnath Kuiry |
24/03/2023 |
₹534,134.00 |
04/05/2023 |
729/ZP |
Not started |
90
|
15th FC TIED (21-22) |
|
247 |
61-05-2022-23 |
Construction of Cement Concrete Road from Rangapukur towards Uttarlakshipur at Brajaballavpur GP, Mouza- Lakshipur under Banshihari-47448439 |
|
Suhita Paul |
23/03/2023 |
₹1,165,385.00 |
02/05/2023 |
698/ZP |
19/05/2023 |
Scheme Completed: 02/08/2023 |
15th FC Un-Tied |
|
248 |
61-04-2022-23 |
Repair and Maintenance of Road from Ratanpur More to Bisrail Hatkhola, nandanpur in P.S. Gangarampur. |
|
Kalyan Bose |
23/03/2023 |
₹1,673,656.00 |
02/05/2023 |
697/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
249 |
61-03-2022-23 |
Repairing and Maintenance of CC Road from Fulbari Hatkhola to Jalangipara under Uday GP in P.S. Gangarampur. |
|
Kalyan Bose |
23/03/2023 |
₹2,786,593.00 |
02/05/2023 |
696/ZP |
12/06/2023 |
90
Days Left:-438
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
250 |
61-02-2022-23 |
Repairing and Maintenance of CC Road from Singrail towards Baptail under Nandanpur GP in P.S. Gangarampur. |
|
Kalyan Bose |
23/03/2023 |
₹1,942,086.00 |
02/05/2023 |
695/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
251 |
61-01-2022-23 |
Repairing and Maintenance of CC Road from Bhaktipur Petrol Pump towards Kulihar, Nandanpur in P.S. Gangarampur. |
|
Kalyan Bose |
23/03/2023 |
₹1,456,698.00 |
02/05/2023 |
694/ZP |
13/07/2023 |
90
Days Left:-407
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
252 |
60-06-2022-23 |
Repair & Maintenance of Battoki Gram PMGSY road towards Prafulla Das House under Sayedpur GP In P.S. Harirampur |
|
Kalyan Bose |
23/03/2023 |
₹515,253.00 |
04/05/2023 |
727/ZP |
14/07/2023 |
60
Days Left:-436
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
253 |
60-05-2022-23 |
Repair and Maintenance of Road from Gadua Shaw House to Singh Para via Pulin Para Nadighat in vill-Belbari under Belbari GP in P.S. Gangarampur. |
|
PABAN BASAK |
23/03/2023 |
₹971,155.00 |
04/05/2023 |
726/ZP |
20/05/2023 |
60
Days Left:-491
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
254 |
60-04-2022-23 |
Repair and Maintenance of Road from Madhu Malakar House to Narayan Deb House in vill-Belbari under Belbari GP in P.S. Gangarampur |
|
PABAN BASAK |
23/03/2023 |
₹445,588.00 |
04/05/2023 |
725/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
255 |
60-03-2022-23 |
Repair and Maintenance of Road from Anesh Ray House to Chabilal House via Saraswati Housein vill-Belbari under Belbari GP in P.S. Gangarampur. |
|
PABAN BASAK |
23/03/2023 |
₹495,098.00 |
04/05/2023 |
724/ZP |
03/06/2023 |
90
Days Left:-447
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
256 |
60-02-2022-23 |
Repair and Maintenance of Road from Nipur Sarkar House to Kalimandir in vill-Belbari under Belbari GP in P.S. Gangarampur. |
|
PABAN BASAK |
23/03/2023 |
₹495,098.00 |
04/05/2023 |
723/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
257 |
60-01-2022-23 |
Repair and Maintenance of Road from Naresh Ghosh House to Sealkuri Sashan in vill-Belbari under Belbari GP in P.S. Gangarampur. |
|
PABAN BASAK |
23/03/2023 |
₹495,098.00 |
04/05/2023 |
722/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
258 |
57-19-2022-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Mokbul Munsi Kamalpur Mouza, Gangarampur GP under Gangarampur Block.-66443536 |
|
Nihar Ghosh |
16/05/2023 |
₹770,406.00 |
02/05/2023 |
693/ZP |
08/08/2023 |
60
Days Left:-411
|
15th FC Tied 2022-23 |
|
259 |
57-18-2022-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Paritosh Ghosh at Khanjapur Mouza, Pundary GP under Harirampur Block-66435718 |
|
Nihar Ghosh |
01/01/1970 |
₹770,406.00 |
05/02/2023 |
692/ZP |
13/07/2023 |
Scheme Completed: 12/10/2023 |
15th FC Tied 2022-23 |
|
260 |
57-17 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Lutfar Rahaman at Kushkari Mouza, Mahabari GP under Banshihari Block.-66435646- |
|
Nihar Ghosh |
03/12/2023 |
₹770,406.00 |
05/02/2023 |
691/ZP |
13/07/2023 |
Scheme Completed: 30/11/2023 |
15th FC Tied 2022-23 |
|
261 |
57-15-2022-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Dhirendra nath Sarkar Sairapur Mouza, Bgelbari-I GP under Gangarampur Block.-6645602 |
|
Nihar Ghosh |
03/12/2023 |
₹770,406.00 |
05/02/2023 |
690/ZP |
01/06/2023 |
60
Days Left:-479
|
15th FC Tied 2022-23 |
|
262 |
57-12-2022-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Budia Biha at Kesorkuri Mouza, Gofanagar GP under Tapan Block.-66435569 |
|
Nihar Ghosh |
03/12/2023 |
₹770,406.00 |
05/02/2023 |
689/ZP |
24/07/2023 |
60
Days Left:-426
|
15th FC Tied 2022-23 |
|
263 |
57-09-2022-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Bimal Hembrom Magurpur Mouza, Rampara Chenchra GP under Tapan Block.-66422560 |
|
Nihar Ghosh |
03/06/2023 |
₹770,406.00 |
05/02/2023 |
688/ZP |
Not started |
60
|
15th FC Tied 2022-23 |
|
264 |
57-08-2022-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Mijanur Sarkar Malahar/Rajballavchak Mouza, Harsura GP under Tapan Block.-66455916 |
|
Nihar Ghosh |
03/12/2023 |
₹770,406.00 |
05/02/2023 |
687/ZP |
08/06/2023 |
60
Days Left:-472
|
15th FC Tied 2022-23 |
|
265 |
57-06-2022-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Ahed Ali Sarkar at Jamin Karai Mouza, Hajratpur GP under Tapan Block.-664356216 |
|
Nihar Ghosh |
03/12/2023 |
₹770,406.00 |
05/02/2023 |
686/ZP |
30/05/2023 |
60
Days Left:-481
|
15th FC 2022-23 |
|
266 |
57-05-2022-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Hasidul Mondal at Kadamtala Mouza, Najirpur GP under Balurghat Block.-66436391 |
|
Nihar Ghosh |
03/12/2023 |
₹770,406.00 |
05/02/2023 |
685/ZP |
Not started |
60
|
15th FC 2022-23 |
|
267 |
57-03-2022-23 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Kajal Kumar Laha at Jatghatak Mouza, Binshira GP under Hili Block.-66436024 |
|
Nihar Ghosh |
03/12/2023 |
₹770,406.00 |
05/02/2023 |
684/ZP |
27/07/2023 |
60
Days Left:-423
|
15th FC Tied 2022-23 |
|
268 |
57-02-2023-24 |
Installation of Solar Based Light Duty Tube-Well(150mm x 100mm) for Minor Irrigation at the Land of Mantasur Rahman at Deor mouza,Deor G.P. under Kumarganj Block-66437097 |
|
Nihar Ghosh |
03/12/2023 |
₹770,406.00 |
05/02/2023 |
683/ZP |
21/07/2023 |
60
Days Left:-429
|
15th FC TIED (2022-23) |
|
269 |
56-04-2022-23 |
Construction of Hume Pipe Culvert at Gurkhari Mandal Para under Bagichapur GP In P.S. Harirampur. |
|
Kalyan Bose |
03/12/2023 |
₹325,168.00 |
05/10/2023 |
760/ZP |
Not started |
60
|
BEUP 42 No Harirampur LAC |
|
270 |
56-03-2022-23 |
Construction of Waiting Shed at Chandipur Taltala in P.S. Shirshi under Dakshin Dinajpur District |
|
Kalyan Bose |
03/12/2023 |
₹306,645.00 |
05/10/2023 |
759/ZP |
Not started |
90
|
BEUP 42 No Harirampur LAC |
|
271 |
56-02-2022-23 |
Construction of Burning Ghat(Crematorium) at Kokil in P.S. Harirampur. |
|
Kalyan Bose |
03/12/2023 |
₹485,576.00 |
05/10/2023 |
758/ZP |
Not started |
90
|
BEUP 42 No Harirampur LAC |
|
272 |
56-01-2022-23 |
Construction of Burning Ghat (Crematorium) at Ayapara in P.S. Harirampur. |
|
Kalyan Bose |
03/12/2023 |
₹485,576.00 |
05/10/2023 |
757/ZP |
Not started |
90
|
BEUP 42 No Harirampur LAC |
|
273 |
55-06-2022-23 |
Construction of Community Toilet front side of Kamalpur FP School, Vill-Kamalpurin Hazratpur GP in P.S. Tapan.-44811577 |
|
Somnath Kuiry |
03/12/2023 |
₹769,772.00 |
05/10/2023 |
756/ZP |
Not started |
90
|
15th FC TIED (2020-21) |
|
274 |
55-04-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at front side of Gopal Member House at Fayespur, Vill-Hakendar/Fayespur, GP_Jahangirpur under Gangarampur PS-47380753 |
|
Kalyan Bose |
03/12/2023 |
₹332,702.00 |
05/10/2023 |
755/ZP |
Not started |
90
|
"15th FC TIED (21-22)" |
|
275 |
55-02-2022-23 |
Supply of Safe Drinking Water by Providing Water ATM at near Jumma Masjid, Tepridaha(Solar Electrical Work), GP-Ganguria under Banshihari PS-44811236 |
|
Suhita Paul |
03/12/2023 |
₹199,998.00 |
05/10/2023 |
754/ZP |
Not started |
90
|
15th FC Tied 20-21 |
|
276 |
25-11-2022-23 |
Construction of RCC Box Bridge (2x 4.00M x 4.00 M) at Deor Over Goalkuri Khari under Kumarganj Block.-60875547 |
|
Kalyan Bose |
23/11/2022 |
₹4,399,874.00 |
09/03/2023 |
292/ZP |
14/07/2023 |
180
Days Left:-316
|
15th FC TIED Supplementary(20-21) |
|
277 |
25-10-2022-23 |
Construction of Community Toilet & Drinking Water Facility at Bindhyswari Mandir under Jahangirpur GP in P.S. Gangarampur-47396391 |
|
Kalyan Bose |
23/11/2022 |
₹970,862.00 |
06/02/2023 |
139/ZP |
Not started |
120
|
"15th FC TIED (21-22)" |
|
278 |
25-07-2022-23 |
Construction of Road CC from Anowarhouse to Amot Kali at Upodeul under Kushmandi.-47447178 |
|
Suhita Paul |
23/11/2022 |
₹1,942,308.00 |
06/02/2023 |
138/ZP |
09/03/2023 |
Scheme Completed: 26/07/2023 |
15th FC Un-TIED (21-22) |
|
279 |
25-02-2022-23 |
Drinking Water facility in frontside of Ushaharan Sandas by Sinking and Installation 150mm x 80mm tube well(solar operated) in P.S. Kushmandi-47388861 |
|
Suhita Paul |
23/11/2022 |
₹970,160.00 |
06/02/2023 |
136/ZP |
Not started |
120
|
"15th FC TIED (21-22)" |
|
280 |
25-06-2022-23 |
Construction of Cc Road from Haripada Karmakar House via Chudin Tudu House to Molla Dighi in P.S. Tapan-47446703 |
|
Somnath Kuiry |
23/11/2022 |
₹1,165,385.00 |
06/02/2023 |
137/ZP |
20/02/2023 |
Scheme Completed: 10/05/2023 |
15th FC Un-TIED (21-22) |
|
281 |
23-11-2022-23 |
High Mast Tower(Solar) at Haripur Bes an Noor Model School(Girls) at Ellahabad GP in P.S. Banshihari, Dakshin Dinajpur-56232801 |
|
Nihar Ghosh |
20/10/2022 |
₹506,935.00 |
09/03/2023 |
293/ZP |
11/03/2023 |
Scheme Completed: 30/07/2023 |
15th FC 2020-21 Savings |
|
282 |
51-07-2023 |
Repairing and Maintenance road from Kharpa Katna Khari Tinkona more towards Bairakuri Samsuddin Mondal House under Harsura GP in P.S. Tapan. |
|
Somnath Kuiry |
09/03/2023 |
₹1,980,392.00 |
26/04/2023 |
662/ZP |
Not started |
90
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
283 |
51-02-2022-23 |
Repairing and Maintenance of CC road Koil Jafarmolla House to Koarsai near Eklabya School under Ganguriya GP in P.S. Banshihari. |
|
Suhita Paul |
09/03/2023 |
₹3,884,542.00 |
26/04/2023 |
661/ZP |
28/04/2023 |
Scheme Completed: 02/08/2023 |
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
284 |
51-01-2022-23 |
Repairing and Maintenance of Road from Bania Para Deep Tubewell towards Ammtala via Pahanpara in Bhatpara GP under Balurghat PS. |
|
PABAN BASAK |
09/03/2023 |
₹1,980,393.00 |
26/04/2023 |
660/ZP |
01/05/2023 |
90
Days Left:-480
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
285 |
50-07-2022-23 |
Repairing and Maintenance road from Kardaha Nadir Ghat to Mukha Para under Ramchandrapur GP in P.S. Tapan. |
|
Somnath Kuiry |
09/03/2023 |
₹990,196.00 |
25/04/2023 |
651/ZP |
Not started |
45
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
286 |
50-06-2022-23 |
Repairing and maintenance road from Kurahar FP School towards Laxminarayanpur Kartik Tala under Gurail GP in P.S. Tapan. |
|
Somnath Kuiry |
09/03/2023 |
₹990,196.00 |
25/04/2023 |
650/ZP |
Not started |
45
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
287 |
50-05-2022-23 |
Repairing of Maintenance road from Goal Kuri Pacca road to ST Girja under Deor GP in P.S. Kumarganj |
|
Somnath Kuiry |
09/03/2023 |
₹971,154.00 |
25/04/2023 |
649/ZP |
31/05/2023 |
Scheme Completed: 05/07/2023 |
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
288 |
50-04-2022-23 |
Repairing of Maintenance road from Jhara Karmatirtho to Jhara More(2nd phase) under Bhour GP in P.S. Kumarganj. |
|
Somnath Kuiry |
09/03/2023 |
₹693,137.00 |
25/04/2023 |
648/ZP |
31/05/2023 |
Scheme Completed: 09/08/2023 |
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
289 |
50-02-2022-23 |
Repairing and Maintenance of Road from Gajen Sarkar House to Malancha Sub-Health Center with Protection work under Danga GP in P.S. Balurghat. |
|
PABAN BASAK |
09/03/2023 |
₹495,098.00 |
25/04/2023 |
647/ZP |
Not started |
45
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
290 |
50-01-2022-23 |
Repairing and Maintenance of Road from Krishnagar More Gopal Murmu House in GP Jalghar under Balurghat PS. |
|
PABAN BASAK |
09/03/2023 |
₹759,600.00 |
25/04/2023 |
646/ZP |
31/05/2023 |
45
Days Left:-495
|
Repair & Maintenance of rural roads other than Gramin Sadak Yojana |
|
291 |
44-11-2022-23 |
Construction of Covered Drain from Chabi Bhattacharjee House to Mithun Orawn House in vill Hili under Hili PS.-58358093 |
|
PABAN BASAK |
08/02/2023 |
₹990,196.00 |
26/04/2023 |
663/ZP |
Not started |
60
|
15th FC TIED (22-23) |
|
292 |
49-20-2022-23 |
Construction of Cement Concrete Road from near Baptail Football Field to Langra Pukur More under GP Rampara Chanchara in P.S. Tapan. L- 1.23 KM |
|
PABAN BASAK |
23/02/2023 |
₹4,111,895.00 |
30/03/2023 |
495/ZP |
14/04/2023 |
60
Days Left:-527
|
RASTASHREE 2023 |
|
293 |
49-18-2022-23 |
Construction of BT Road from Salash Paschimpara Milon Halder House to Biswanath House vill of Biswanathpur under Hajratpur GP in P.S. Tapan. L- 0.67 KM |
|
Somnath Kuiry |
23/03/2023 |
₹1,996,213.00 |
24/03/2023 |
445/ZP |
Not started |
90
|
RASTASHREE 2023 |
|
294 |
49-17-2022-23 |
Construction of CC Road from Bhagait Joute Godown to Satish Tirki House vill of Bhagait under Hajratpur GP in P.S. Tapan. L- 0.67 KM |
|
Somnath Kuiry |
23/02/2023 |
₹2,127,269.00 |
22/03/2023 |
387/ZP |
31/03/2023 |
Scheme Completed: 06/08/2023 |
RASTASHREE 2023 |
|
295 |
49-16-2022-23 |
Construction of CC Road from Polo Roy to Salga Nimesh Roy House vill of Ghatika under Gurail GP in P.S. Tapan. L- 1.34 KM |
|
Somnath Kuiry |
23/02/2023 |
₹4,491,828.00 |
30/03/2023 |
494/ZP |
05/04/2023 |
Scheme Completed: 16/08/2023 |
RASTASHREE 2023 |
|
296 |
49-15-2022-23 |
Construction of Metal Road from Alinagar Battala to Puthai Para, vill of Jajier under Dwipkhanda GP In P.S. Tapan. L-1.31 KM |
|
Somnath Kuiry |
23/02/2023 |
₹3,795,685.00 |
24/03/2023 |
444/ZP |
Not started |
90
|
RASTASHREE 2023 |
|
297 |
49-14-2022-23 |
Construction of BT Road from Mission More to Khayer Bari village of Chakbalaram under Gofanagar GP in P.S. Tapan. L-1.20 KM |
|
Somnath Kuiry |
23/02/2023 |
₹3,593,112.00 |
30/03/2023 |
496/ZP |
05/04/2023 |
Scheme Completed: 11/10/2023 |
RASTASHREE 2023 |
|
298 |
49-13-2022-23 |
Construction of CC Road from Kaikuri to Dharampur Kalitala via Mangal Mandal House, Dharampur under Saiyedpur GP in P.S. Harirampur.L-0.71 KM |
|
Kalyan Bose |
23/02/2023 |
₹2,474,660.00 |
22/03/2023 |
386/ZP |
Not started |
60
|
RASTASHREE 2023 |
|
299 |
49-08-2022-23 |
Construction of CC Road from House of Bifal Mahato via Bhitor Mousum via Dangapara to Buripukur, Vill-Bhitor Masum, GP-Barjaballavpur in P.S. Tapan. L- 1.23 KM |
|
Suhita Paul |
23/02/2023 |
₹3,970,199.00 |
30/03/2023 |
491/ZP |
Not started |
60
|
RASTASHREE 2023 |
|
300 |
49-07-2022-23 |
Construction of Road from Khosalput Albenus Murmu House to Thola Village under Rampara CHenchar GP in P.S. Tapan. L-1.30 KM |
|
PABAN BASAK |
23/02/2023 |
₹4,029,699.00 |
30/03/2023 |
490/ZP |
Not started |
90
|